Optimal robotic assembly sequence planning using stability graph through stable assembly subset identification

被引:22
|
作者
Murali, G. Bala [1 ]
Deepak, B. B. V. L. [1 ]
Raju, M. V. A. [2 ]
Biswal, B. B. [3 ]
机构
[1] Natl Inst Technol, Dept Ind Design, Rourkela 769008, Odisha, India
[2] Natl Inst Technol, Dept Mech Engn, Pondicherry, India
[3] Natl Inst Technol, Dept Mech Engn, Shillong, Meghalaya, India
关键词
Assembly sequence planning; assembly subset detection method; computer aided design; stability graph; computer aided three dimensional interactive application; PARTICLE SWARM OPTIMIZATION; GENETIC-ALGORITHM; GENERATION;
D O I
10.1177/0954406219842908
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Assembly sequence planning is one of the multi-model optimization problems, in which more than one objective function has to be optimized at a time to obtain the quality assembly sequence. Moreover obtaining the feasible sequences from the possible finite set of sequences is a difficult task as the assembly sequence planning problem is N-P hard combinatorial problem. To solve the assembly sequence planning problem, researchers have developed various techniques to obtain the optimum solution. The developed methodologies have many drawbacks like struck at local optima, poor performance, huge search space and many more. To overcome these difficulties, the current research work aims to use stability graph to generate stable assembly subsets for obtaining the optimum assembly sequences. In the proposed methodology, to reduce the search space and to obtain the quality assembly sequences, stability graph is considered. Moreover, the fitness of assembly subsets is evaluated according to the user weights at each level before proceeding to the higher levels. Due to this, the higher fitness value subsets are eliminated at each stage by which time of execution will reduce enormously. The proposed methodology has implemented on various industrial products and compared the results with the various well-known algorithms.
引用
收藏
页码:5410 / 5430
页数:21
相关论文
共 50 条
  • [21] Assembly sequence planning based on mating liaison graph
    Tan, GY
    Li, GH
    Li, GB
    Li, ZJ
    [J]. PROGRESS OF MACHINING TECHNOLOGY: WITH SOME TOPICS IN ADVANCED MANUFACTURING TECHNOLOGY, 2000, : 930 - 935
  • [22] Integrated Design for Assembly Approach Using Ant Colony Optimization Algorithm for Optimal Assembly Sequence Planning
    Murali, G. Bala
    Deepak, B. B. V. L.
    Biswal, B. B.
    Khamari, Bijaya Kumar
    [J]. COMPUTATIONAL INTELLIGENCE IN DATA MINING, 2019, 711 : 249 - 259
  • [23] A comparative analysis of constraint and connectivity graph techniques for assembly sequence generation in robotic assembly cells
    Dash, Parameswar
    Sahu, Basant Kumar
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART E-JOURNAL OF PROCESS MECHANICAL ENGINEERING, 2024,
  • [24] ROBOTIC ASSEMBLY SEQUENCE PLANNING AND OPTIMIZATION BY CUCKOO SEARCH ALGORITHM
    Mishra, A.
    Deb, S.
    [J]. 24TH INTERNATIONAL CONFERENCE ON PRODUCTION RESEARCH (ICPR), 2017, : 604 - 609
  • [25] Iteratively Refined Feasibility Checks in Robotic Assembly Sequence Planning
    Rodriguez, Ismael
    Nottensteiner, Korbinian
    Leidner, Daniel
    Kassecker, Michael
    Stulp, Freek
    Albu-Schaeffer, Alin
    [J]. IEEE ROBOTICS AND AUTOMATION LETTERS, 2019, 4 (02): : 1416 - 1423
  • [26] Pattern Recognition for Knowledge Transfer in Robotic Assembly Sequence Planning
    Rodriguez, Ismael
    Nottensteiner, Korbinian
    Leidner, Daniel
    Durner, Maximilian
    Stulp, Freek
    Albu-Schaeffer, Alin
    [J]. IEEE ROBOTICS AND AUTOMATION LETTERS, 2020, 5 (02) : 3666 - 3673
  • [27] Effect of Considering Secondary Parts as Primary Parts for Robotic Assembly Using Stability Graph
    Gunji, Bala Murali
    Deepak, B. B. V. L.
    Biswal, B. B.
    [J]. ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2020, 45 (02) : 743 - 764
  • [28] Cyber-physical assembly system-based optimization for robotic assembly sequence planning
    Ying, Kuo-Ching
    Pourhejazy, Pourya
    Cheng, Chen-Yang
    Wang, Chi-Hsin
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 2021, 58 : 452 - 466
  • [29] Effect of Considering Secondary Parts as Primary Parts for Robotic Assembly Using Stability Graph
    Bala Murali Gunji
    B. B. V. L. Deepak
    B. B. Biswal
    [J]. Arabian Journal for Science and Engineering, 2020, 45 : 743 - 764
  • [30] Optimal Assembly Sequence generation through computational approach
    M V A Raju Bahubalendruni
    Anil Kumar Gulivindala
    S S V Prasad Varupala
    Dileep Kumar Palavalasa
    [J]. Sādhanā, 2019, 44