Application of Lean Six Sigma Methods to Prevent Crank Defect in A Hospital Equipment Company: A Case Study

被引:1
|
作者
Setiyaningrum, Fidia [1 ]
Pujiyanto, Eko [1 ]
Herdiman, Lobes [1 ]
机构
[1] Sebelas Maret Univ, Fac Engn, Ind Engn Dept, Surakarta 57126, Indonesia
关键词
D O I
10.1063/1.5098282
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Crank is an important part of the bed to raise and lower the bed. Crank consists of outer pipes, threads, and nuts. Based on observations, crank defect mostly occurred in the production process of thread profiles. The defect is caused by variance in diameter minor and diameter major. This can make the crank stuck. The problem is caused by the carbide insert tool used has worn out because the optimal time of use of the tool has not been considered and process stages that are not in accordance with quality assurance management. The purpose of this research is to reduce defects in the crank production plan and prevent defects after usage by consumers. This paper provides recommendations for improvements in production process management. Lean six sigma aims to improve production line efficiency by reducing production costs, eliminating defects and establishing capability process so that the company can produce high quality product. In this paper define, measure, analyze, improve, control (DMAIC) is used as a lean six sigma tool to solve the problem. Therefore, DMAIC is used to identify, measure, and discover the causes of the problem and to suggest some solutions to control and reduce the defect. The use of simple mathematical model is proposed to determine the optimal used time of the carbide insert tool. The results show that the capability process increases from 3.8 to 4.1 sigma which lead to cost saving from 25-40% to 15-25% quality cost.
引用
收藏
页数:8
相关论文
共 50 条
  • [1] When Lean and Six Sigma converge: a case study of a successful implementation of Lean Six Sigma at an aerospace company
    Akbulut-Bailey, Asli Yagmur
    Motwani, Jaideep
    Smedley, Everett M.
    [J]. INTERNATIONAL JOURNAL OF TECHNOLOGY MANAGEMENT, 2012, 57 (1-3) : 18 - 32
  • [2] Lean Six Sigma and TPM for the Improvement of Equipment Maintenance Process in a Service Sector Company: A Case Study
    Barriga, Ana Laura
    Gonzales, Maria Gimena
    Fernando Ruiz-Ruiz, Marcos
    [J]. INDUSTRIAL ENGINEERING AND INDUSTRIAL MANAGEMENT, IEIM 2024, 2024, 2070 : 155 - 169
  • [3] The Implementation of Lean Six Sigma in A Book Manufacturing Company: A Case Study
    Deamonita, Amanda Intan Lady
    Pujiyanto, Eko
    Rosyidi, Cucuk Nur
    [J]. 4TH INTERNATIONAL CONFERENCE ON INDUSTRIAL, MECHANICAL, ELECTRICAL, AND CHEMICAL ENGINEERING, 2019, 2097
  • [4] Lean Marketing: Application of the Lean Six Sigma to Marketing - Case Study
    Sa, Jose Carlos
    Pereira, Manuel Sousa
    Almeida, Sergio
    [J]. INFORMATION SYSTEMS AND TECHNOLOGIES, WORLDCIST 2022, VOL 3, 2022, 470 : 505 - 512
  • [5] Lean Marketing: Application of the Lean Six Sigma to Marketing - Case Study
    Sa, Jose Carlos
    Pereira, Manuel Sousa
    Almeida, Sergio
    [J]. INFORMATION SYSTEMS AND TECHNOLOGIES, WORLDCIST 2022, VOL 2, 2022, 469 : 66 - 73
  • [6] Application of Lean Six Sigma to a panel equipment manufacturer
    Wang, Fu-Kwun
    Chen, Kao-Shan
    [J]. TOTAL QUALITY MANAGEMENT & BUSINESS EXCELLENCE, 2012, 23 (3-4) : 417 - 429
  • [7] Application of Lean Six Sigma for sustainable maintenance: case study
    Antosz, Katarzyna
    Jasiulewicz-Kaczmarek, Malgorzata
    Waszkowski, Robert
    Machado, Jose
    [J]. IFAC PAPERSONLINE, 2022, 55 (19): : 181 - 186
  • [8] Application of Lean Six Sigma in IT support services – a case study
    E.V G.
    Antony J.
    Sunder M V.
    [J]. TQM Journal, 2020, 31 (03): : 417 - 435
  • [9] Assembly Process Improvement in Company S: A Lean Six Sigma Case Study
    Zhang, Yang
    He, Zhen
    Chen, Tianyu
    Zhang, Min
    [J]. ENGINEERING SOLUTIONS FOR MANUFACTURING PROCESSES, PTS 1-3, 2013, 655-657 : 2371 - +
  • [10] Implementing a Lean Six Sigma standardized toolset in a manufacturing company: a case study
    Panayiotou, Nikolaos A.
    Stergiou, Konstantinos E.
    Chronopoulos, Vassilis
    [J]. INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2022, 71 (04) : 1164 - 1187