共 7 条
- [2] Combined revealed and stated preference nested logit access and mode choice model for multiple mass transit technologies [J]. TRANSPORTATION NETWORK MODELING 2001: PLANNING AND ADMINISTRATION, 2001, (1771): : 38 - 45
- [5] Model for Estimation of Time and Cost for Tunnel Projects Based on Risk Evaluation [J]. Rock Mechanics and Rock Engineering, 2005, 38 : 373 - 398