Antecedents and consequences of supply chain risk management capabilities: an investigation in the post-coronavirus crisis

被引:122
|
作者
Yang, Jie [1 ]
Xie, Hongming [2 ]
Yu, Guangsheng [3 ]
Liu, Mingyu [4 ]
机构
[1] Univ Houston Victoria, Sch Business Adm, Katy, TX USA
[2] Guangzhou Univ, Sch Management, Dept Innovat & Strategy, Guangzhou, Peoples R China
[3] Fudan Univ, Sch Management, Dept Business Adm, Shanghai, Peoples R China
[4] Fudan Univ, Sch Management, Dept Ind Econ, Shanghai, Peoples R China
基金
中国国家自然科学基金;
关键词
Disruption orientation; impact; visibility; risk management; resilience; RESILIENCE; PERFORMANCE; VISIBILITY; FRAMEWORK; INSIGHTS;
D O I
10.1080/00207543.2020.1856958
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study evaluates the antecedents and consequences of supply chain risk management capabilities. Informed by the information processing theory, we conceptualize supply chain disruption orientation as an organic control and supply chain visibility as a mechanistic control. Both control mechanisms build the information processing capacities, which need to fit with the information processing requirements imposed by disruption impact during the adverse supply chain disruptions in the wake of the Coronavirus Covid-19 pandemic. When the fit is realized, supply chain risk management capabilities will be improved. This study also examines the role of supply chain risk management capabilities in bolstering supply chain resilience to the catastrophic occurrence. Our findings indicate the fit between information processing capacities and requirements enhances supply chain risk management capabilities, which, in turn, result in enhanced supply chain resilience.
引用
收藏
页码:1573 / 1585
页数:13
相关论文
共 50 条
  • [21] Antecedents for the adoption and execution of supply chain management
    Kotzab, Herbert
    Teller, Christoph
    Grant, David B.
    Sparks, Leigh
    [J]. SUPPLY CHAIN MANAGEMENT-AN INTERNATIONAL JOURNAL, 2011, 16 (04) : 231 - 245
  • [22] Cyber Supply Chain Risk Management: Toward an Understanding of the Antecedents to Demand for Assurance
    Hampton, Clark
    Sutton, Steve G.
    Arnold, Vicky
    Khazanchi, Deepak
    [J]. JOURNAL OF INFORMATION SYSTEMS, 2021, 35 (02) : 37 - 60
  • [23] Supply chain quality integration: relational antecedents and operational consequences
    Yu, Yubing
    Huo, Baofeng
    [J]. SUPPLY CHAIN MANAGEMENT-AN INTERNATIONAL JOURNAL, 2018, 23 (03) : 188 - 206
  • [24] Highlight risk management in supply chain finance: effects of supply chain risk management capabilities on financing performance of small-medium enterprises
    Qiao, Ruilei
    Zhao, Lindu
    [J]. SUPPLY CHAIN MANAGEMENT-AN INTERNATIONAL JOURNAL, 2023, 28 (05) : 843 - 858
  • [25] Evaluating antecedents and consequences of supply chain activities: an integrative perspective
    Lee, Byoung-Chan
    Kim, Pal-Sul
    Hong, Kwan-Soo
    Lee, In
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (03) : 657 - 682
  • [26] Antecedents and consequences of green supply chain management practices: a study of Indian food processing industry
    Maaz, Mohd Abdul Muqeet
    Ahmad, Rais
    Abad, Arif
    [J]. BENCHMARKING-AN INTERNATIONAL JOURNAL, 2022, 29 (07) : 2045 - 2073
  • [27] Antecedents and consequences of integration of supply chain information systems into the textile supply chain. A Kenyan textile supply chain perspective
    Musau, Enock G.
    [J]. JOURNAL OF TRANSPORT AND SUPPLY CHAIN MANAGEMENT, 2021, 15
  • [28] Supply chain management and information sharing capabilities
    Abu-Shanab, Emad
    [J]. PROCEEDINGS OF THE 8TH EUROPEAN CONFERENCE ON KNOWLEDGE MANAGEMENT, VOL 1 AND 2, 2007, : 8 - 14
  • [29] Supply Chain Orientation and Supply Chain Risk Management Capabilities: Mechanisms for Supply Chain Performance of Agro-Food Processing Firms in Uganda
    Tukamuhabwa, Benjamin R.
    [J]. JOURNAL OF AFRICAN BUSINESS, 2023, : 649 - 672
  • [30] Supply chain management resources, capabilities and execution
    Kotzab, Herbert
    Teller, Christoph
    Grant, David B.
    Friis, Anders
    [J]. PRODUCTION PLANNING & CONTROL, 2015, 26 (07) : 525 - 542