A framework to implement human reliability analysis during early design stages of advanced reactors

被引:4
|
作者
Hamza, Mostafa [1 ]
Diaconeasa, Mihai A. [1 ]
机构
[1] North Carolina State Univ, Dept Nucl Engn, Raleigh, NC 27695 USA
关键词
PRA; HRA; HTGR-PB; Advanced reactors; HUMAN ERROR; PROBABILITIES; OPERATION;
D O I
10.1016/j.pnucene.2022.104171
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
Nuclear power plants require human actions throughout their lifecycle from design, construction, operation, and decommissioning. However, for advanced reactors (e.g., Generation IV), the reliance on human intervention in safety-related actions is expected to be reduced or completely replaced by automated actions. The Probabilistic Risk Assessment (PRA) Standard for Advanced Non-LWR Nuclear Power Plants requires that the impacts of all operator actions are captured and incorporated in the risk of the modeled plant. Moreover, the Modernization of Technical Requirements for Licensing Advanced Reactors requires human reliability analysis (HRA) to be included throughout all design and PRA development stages. However, due to the lack of details during the early design stages, HRA is often postponed until the design is mature enough. Conducting HRA in later design stages, though it may be adequate in capturing pre-, at-, and post-initiators comes short of informing the design itself in the iterative design lifecycle. Hence, this paper presents a framework to include HRA during the design's early stages, pre-conceptual or conceptual. The proposed framework provides a process for the removal of operator actions that do not contribute to the risk and the identification of all key operator actions that are critical to the safety of the design. The results of this framework are then used to inform the design of those safety-related operator actions to update the design further. Then, using information from the updated design, this framework can be reapplied to investigate the impact of the design update on human reliability. The PRA model of the X-energy's pre-conceptual Xe-100 high-temperature gas-cooled pebble-bed reactor (HTGR-PB) design is used to demonstrate the approach. In the pre-conceptual Xe-100 PRA model, also called Phase 0 PRA model, human actions were considered an integral part of analyzing the plant response to different initiating events. Hence, in this paper, all possible human actions in the Xe-100 PRA model are identified, analyzed, and removed to emulate a design relying only on the available automated control systems. The preliminary results of this assessment show how safe the Xe-100 design is even without crediting any human actions. The results also list necessary sequences in which operator actions are critical to the risk profile of the design.
引用
收藏
页数:11
相关论文
共 50 条
  • [31] Systematic framework for environmentally conscious chemical process design: Early and detailed design stages
    Chen, H
    Shonnard, DR
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2004, 43 (02) : 535 - 552
  • [32] Function orientated approach for reliability modeling of mechatronic systems in early design stages
    Mannhart, A.
    Bilgic, A.
    Bertsche, B.
    RISK, RELIABILITY AND SOCIETAL SAFETY, VOLS 1-3: VOL 1: SPECIALISATION TOPICS; VOL 2: THEMATIC TOPICS; VOL 3: APPLICATIONS TOPICS, 2007, : 2165 - +
  • [33] A nonparametric Bayesian network approach to assessing system reliability at early design stages
    Lee, Dongjin
    Pan, Rong
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2018, 171 : 57 - 66
  • [34] Reliability implications of advanced analysis in design of steel frames
    Buonopane, SG
    Schafer, BW
    Igusa, T
    ADVANCES IN STRUCTURES, VOLS 1 AND 2, 2003, : 547 - 553
  • [35] The Increased Expression of Periostin During Early Stages of Prostate Cancer and Advanced Stages of Cancer Stroma
    Tsunoda, Toshiyuki
    Furusato, Bunjo
    Takashima, Yasuo
    Ravulapalli, Suma
    Dobi, Albert
    Srivastava, Shiv
    McLeod, David G.
    Sesterhenn, Isabell A.
    Ornstein, David K.
    Shirasawa, Senji
    PROSTATE, 2009, 69 (13): : 1398 - 1403
  • [37] A METHODOLOGY FOR THE INTEGRATION OF A MECHANISTIC SOURCE TERM ANALYSIS IN A PROBABILISTIC FRAMEWORK FOR ADVANCED REACTORS
    Grabaskas, Dave
    Brunett, Acacia J.
    Bucknor, Matthew
    PROCEEDINGS OF THE 24TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING, 2016, VOL 2, 2016,
  • [38] Analysis tools target early stages of PCB design
    Donlin, M
    COMPUTER DESIGN, 1996, 35 (09): : 30 - 35
  • [39] Modelling Bus Contention during System Early Design Stages
    Trilla, David
    Hernandez, Carles
    Abella, Jaume
    Cazorla, Francisco J.
    2017 12TH IEEE INTERNATIONAL SYMPOSIUM ON INDUSTRIAL EMBEDDED SYSTEMS (SIES), 2017, : 65 - 72
  • [40] Human reliability analysis for advanced control room of KNGR
    Kim, MR
    Park, SK
    PSAM 5: PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOLS 1-4, 2000, (34): : 803 - 808