The Stakeholder Analysis of Progress Management in Prophase of the Hydropower Project

被引:0
|
作者
Li, Ya [1 ]
Liu, Hongyong [1 ]
Guo, Ji [1 ]
机构
[1] Southwest Petr Univ, Chengdu, Sichuan Prov, Peoples R China
关键词
Hydropower project; Prophase of the progress; Stakeholders; Causal graph; Dynamic analysis;
D O I
暂无
中图分类号
C [社会科学总论];
学科分类号
03 ; 0303 ;
摘要
This paper takes the main project construction of hydropower engineering as the time control point, and the prophase of the project can be defined as the stage before the point. The impacts on the prophase of schedule are systematically analyzed based on the stakeholders, such as the owner, consulting, design, supervision, construction, material equipment suppliers, banks, governments, electric power sector, telecommunications sector and local residents, to establish the analysis structure model. According to the special practice, which is the phases of feasibility study, design, bidding, and construction of road, bridge and temporary facilities are go on at the same time, these stakeholders are mainly analyzed to put forward the causal graph on the phases of feasibility study, design and bidding. The dynamic relationships among each factor are concretely analyzed. The measurement and advice are proposed according to the results to achieve the dynamic management of progress control and the goal of time.
引用
收藏
页码:222 / 228
页数:7
相关论文
共 50 条
  • [1] Stakeholder impact analysis in construction project management
    Olander, Stefan
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2007, 25 (03) : 277 - 287
  • [2] Project stakeholder management
    Karlsen, JT
    ENGINEERING MANAGEMENT IN THE GLOBAL ENVIRONMENTS, PROCEEDINGS, 2002, : 65 - 70
  • [3] Project Stakeholder Management
    Walker, Derek
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2014, 7 (02) : 318 - +
  • [4] Project Stakeholder Management
    Ponnappa, Gitanjali
    PROJECT MANAGEMENT JOURNAL, 2014, 45 (02) : e3 - e3
  • [5] Stakeholder analysis for R&D project management
    Elias, AA
    Cavana, RY
    Jackson, LS
    R & D MANAGEMENT, 2002, 32 (04) : 301 - 310
  • [6] Stakeholder analysis for Lean Six Sigma project management
    Elias, Arun Abraham
    INTERNATIONAL JOURNAL OF LEAN SIX SIGMA, 2016, 7 (04) : 394 - 405
  • [7] The project management model of hydropower development enterprises: An analysis of HeXie management theory
    Xianju, Zeng
    Yournin, Xi
    Ziye, Li
    GLOBALIZATION CHALLENGE AND MANAGEMENT TRANSFORMATION, VOLS I - III, 2007, : 1861 - 1868
  • [8] Integrating Stakeholder and Social Network Analysis into Innovation Project Management
    Gebhardt, Karolin
    Riel, Andreas
    Maes, Tom
    SYSTEMS, SOFTWARE AND SERVICES PROCESS IMPROVEMENT (EUROSPI 2020), 2020, 1251 : 794 - 804
  • [9] Stakeholder management during project inception: Strategic needs analysis
    Smith, J. (smithjj@unimelb.edu.au), 1600, American Society of Civil Engineers (10):
  • [10] Stakeholder management and project management office: effect on project results
    Rabechini, Roque, Jr.
    Morris Abarca, Eddy Alberto
    Salcedo, Nestor U.
    P. Horna Saldana, Cesar Jhonnatan
    Paiva, Danielle Cruz
    RAE-REVISTA DE ADMINISTRACAO DE EMPRESAS, 2022, 62 (06):