Progress in the design of the ITER Neutral Beam cell Remote Handling System

被引:14
|
作者
Shuff, R. [1 ]
Van Uffelen, M. [1 ]
Damiani, C. [1 ]
Tesini, A. [2 ]
Choi, C. -H. [2 ]
Meek, R. [3 ]
机构
[1] Fus Energy, Barcelona 08019, Spain
[2] ITER Org, F-13115 St Paul Les Durance, France
[3] Oxford Technol Ltd, Abingdon OX14 1RL, Oxon, England
关键词
F4E; ITER; Maintenance; Neutral Beam; Nuclear fusion; Remote Handling;
D O I
10.1016/j.fusengdes.2014.01.043
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The ITER Neutral Beam cell will include a suite of Remote Handling equipment for maintenance tasks. This paper summarises the current status and recent developments in the design of the ITER Neutral Beam Remote Handling System. Its concept design was successfully completed in July 2012 by CCFE in the frame of a grant agreement with F4E, in collaboration with the ITER Organisation, including major systems like monorail crane, Beam Line Transporter, beam source equipment, upper port and neutron shield equipment and associated tooling. Research and development activities are now underway on the monorail crane radiation hardened on-board control system and first of a kind remote pipe and lip seal maintenance tooling for the beam line vessel, reported in this paper. (C) 2014 Elsevier B.V. All rights reserved.
引用
收藏
页码:2378 / 2382
页数:5
相关论文
共 50 条
  • [41] The remote handling systems for ITER
    Ribeiro, Isabel
    Damiani, Carlo
    Tesini, Alessandro
    Kakudate, Satoshi
    Siuko, Mikko
    Neri, Carlo
    [J]. FUSION ENGINEERING AND DESIGN, 2011, 86 (6-8) : 471 - 477
  • [42] Remote handling maintenance of ITER
    Haange, R.
    [J]. Nuclear Fusion, 1999, 39 (Special Issu): : 2043 - 2050
  • [43] Conceptual design and integration of a diagnostic neutral beam in ITER
    Di Pietro, E
    Costley, A
    Inoue, T
    Krylov, A
    Panasenkov, A
    Utin, Y
    Vayakis, G
    Von Hellerman, M
    Yamada, M
    [J]. FUSION ENGINEERING AND DESIGN, 2001, 56-57 : 929 - 934
  • [44] Cryopump design development for the ITER Neutral Beam Injectors
    Dremel, M.
    Day, Chr.
    Hanke, S.
    Luo, X.
    [J]. FUSION ENGINEERING AND DESIGN, 2009, 84 (2-6) : 689 - 693
  • [45] Remote maintenance scenario of the caesium ovens and beam source of the ITER heating neutral beam
    Choi, Chang-Hwan
    Damiani, Carlo
    Gutierrez, Mikel Bilbao
    Balague, Susagna
    Bastida, Jose Luis Fernandez
    Martins, Nuno
    Acosta, Sergi
    Shi, Shanshuang
    Yokoyama, Taku
    Graceffa, Joseph
    Urbani, Marc
    Geli, Francois
    Tayibi, Anass El-Ouazzani
    Antola, Lorenzo
    [J]. FUSION ENGINEERING AND DESIGN, 2023, 196
  • [46] Progress in control and data acquisition for the ITER neutral beam test facility
    Luchetta, Adriano
    Manduchi, Gabriele
    Taliercio, Cesare
    Soppelsa, Anton
    Paolucci, Francesco
    Sartori, Filippo
    Barbato, Paolo
    Capobianco, Roberto
    Breda, Mauro
    Molon, Federico
    Moressa, Modesto
    Polato, Sandro
    Simionato, Paola
    Zampiva, Enrico
    [J]. FUSION ENGINEERING AND DESIGN, 2013, 88 (6-8) : 492 - 496
  • [47] Generic control system design for the Cassette Multifunctional Mover and other ITER remote handling equipment
    Irving, A
    Palmer, J
    Siuko, M
    [J]. FUSION ENGINEERING AND DESIGN, 2005, 75-79 : 553 - 557
  • [48] Development of the remote handling connector for ITER divertor diagnostic system
    Lyytinen, Janne
    Tikka, Petri
    Maatta, Timo
    Avikainen, Timo
    Rantala, Seppo
    [J]. FUSION ENGINEERING AND DESIGN, 2021, 165
  • [49] Impact hammer test of ITER blanket remote handling system
    Noguchi, Yuto
    Maruyama, Takahito
    Ueno, Kenichi
    Komai, Masafumi
    Takeda, Nobukazu
    Kakudate, Satoshi
    [J]. FUSION ENGINEERING AND DESIGN, 2016, 109 : 1291 - 1295
  • [50] Recovery from failures of ITER blanket remote handling system
    Maruyama, Takahito
    Noguchi, Yuto
    Takeda, Nobukazu
    [J]. FUSION ENGINEERING AND DESIGN, 2017, 124 : 669 - 672