Constraint Aggregation in Column Generation Models for Resource-Constrained Covering Problems

被引:4
|
作者
Porumbel, Daniel [1 ]
Clautiaux, Francois [2 ]
机构
[1] CNAM, CEDRIC, F-75003 Paris, France
[2] Univ Bordeaux, 351,Cours Liberat, F-33405 Talence, France
关键词
column generation; cutting and packing; aggregation; BIN PACKING;
D O I
10.1287/ijoc.2016.0718
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
We propose an aggregation method to reduce the size of column generation (CG) models for covering problems in which the feasible subsets depend on a resource constraint. The aggregation relies on a correlation between the resource consumption of the elements and the corresponding optimal dual values. The resulting aggregated dual model is a restriction of the original one, and it can be rapidly optimized to obtain a feasible dual solution. A primal bound can also be obtained by restricting the set of columns to those saturated by the dual feasible solution obtained by aggregation. The convergence is realized by iterative disaggregation until the gap is closed by the bounds. Computational results show the usefulness of our method for different cutting-stock problems. An important advantage is the fact that it can produce high-quality dual bounds much faster than the traditional Lagrangian bound used in stabilized column generation.
引用
收藏
页码:170 / 184
页数:15
相关论文
共 50 条
  • [1] Models and column generation approach for the resource-constrained minimum cost path problem with relays
    Li, Xiangyong
    Lin, Shaochong
    Tian, Peng
    Aneja, Y. P.
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2017, 66 : 79 - 90
  • [2] A Constraint-Based Approach to Modeling and Solving Resource-Constrained Scheduling Problems
    Sitek, Pawel
    Wikarek, Jaroslaw
    [J]. COMPUTATIONAL COLLECTIVE INTELLIGENCE, ICCCI 2016, PT I, 2016, 9875 : 423 - 433
  • [3] Logic-based constraint handling in PF resource-constrained scheduling problems
    Zhang, J. Y.
    Sun, J. G.
    Yang, Q. Y.
    [J]. COMPUTATIONAL METHODS, PTS 1 AND 2, 2006, : 1177 - +
  • [4] Characterization and generation of a general class of resource-constrained project scheduling problems
    Kolisch, R
    Sprecher, A
    Drexl, A
    [J]. MANAGEMENT SCIENCE, 1995, 41 (10) : 1693 - 1703
  • [5] A hybrid constraint propagation mechanism for resource-constrained scheduling
    Zhang, JY
    Sun, JG
    [J]. PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2004, : 638 - 642
  • [6] A column-generation-based algorithm for a resource-constrained project scheduling problem with a fractional shared resource
    Wang, Qiang
    Liu, Changchun
    Zheng, Li
    [J]. ENGINEERING OPTIMIZATION, 2020, 52 (05) : 798 - 816
  • [7] A Column Generation Algorithm for the Resource-Constrained Order Acceptance and Scheduling on Unrelated Parallel Machines
    Song, Yujian
    Xue, Ming
    Hua, Changhua
    Wang, Wanli
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [8] Event-based MILP models for resource-constrained project scheduling problems
    Kone, Oumar
    Artigues, Christian
    Lopez, Pierre
    Mongeau, Marcel
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) : 3 - 13
  • [9] Data Expansion for Resource-Constrained Keyphrase Generation
    Yin, Guoshun
    Yang, Peng
    Yu, Yao
    Hu, Zhongjian
    Yang, Dongmei
    [J]. ADVANCED INTELLIGENT COMPUTING TECHNOLOGY AND APPLICATIONS, PT IV, ICIC 2024, 2024, 14878 : 422 - 433
  • [10] A System for Generation and Visualization of Resource-Constrained Projects
    Bofill, Miquel
    Coll, Jordi
    Suy, Josep
    Villaret, Mateu
    [J]. ARTIFICIAL INTELLIGENCE RESEARCH AND DEVELOPMENT: RECENT ADVANCES AND APPLICATIONS, 2014, 269 : 237 - 246