Logic-based constraint handling in PF resource-constrained scheduling problems

被引:0
|
作者
Zhang, J. Y. [1 ]
Sun, J. G. [1 ]
Yang, Q. Y. [1 ]
机构
[1] Jilin Univ, Coll Comp Sci & Technol, Changchun 130012, Peoples R China
基金
巴西圣保罗研究基金会; 美国国家科学基金会;
关键词
scheduling; constraint handling; logic; discrete optimization;
D O I
10.1007/978-1-4020-3953-9_27
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Resource-constrained scheduling problem is one kind of typical real-life discrete optimization problems, which is one of the strongest application areas of constraint programming. In the constraint programming toolkit 'Mingyue', which embed constraints in the object-oriented language C++, we design a new logic-based method for handling the constraints in the resource-constrained scheduling problem. In this paper, we propose a way of describing those constraints with the discrete-variable logic formula. Based on this model, a resolution algorithm is designed for filtering the discrete variables' domain. Comparisons with other constraint handling approaches and related literature clearly show that our approach can describe the constraints in the high level and solve the resource-constrained scheduling problem in the logic framework.
引用
收藏
页码:1177 / +
页数:2
相关论文
共 50 条
  • [1] Handling Alternative Activities in Resource-Constrained Project Scheduling Problems
    Kuster, Juergen
    Jannach, Dietmar
    Friedrich, Gerhard
    [J]. 20TH INTERNATIONAL JOINT CONFERENCE ON ARTIFICIAL INTELLIGENCE, 2007, : 1960 - 1965
  • [2] A Constraint-Based Approach to Modeling and Solving Resource-Constrained Scheduling Problems
    Sitek, Pawel
    Wikarek, Jaroslaw
    [J]. COMPUTATIONAL COLLECTIVE INTELLIGENCE, ICCCI 2016, PT I, 2016, 9875 : 423 - 433
  • [3] A logic-based approach to scheduling problems with resource constraints
    Pinto, JM
    Grossmann, IE
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 1997, 21 (08) : 801 - 818
  • [4] Handling airport ground processes based on resource-constrained project scheduling
    Kuster, Jurgen
    Jannach, Dietmar
    [J]. ADVANCES IN APPLIED ARTICIAL INTELLIGENCE, PROCEEDINGS, 2006, 4031 : 166 - 176
  • [5] A hybrid constraint propagation mechanism for resource-constrained scheduling
    Zhang, JY
    Sun, JG
    [J]. PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2004, : 638 - 642
  • [6] A Logic-based Branch and Bound Algorithm for Resource Constrained Scheduling Problem
    Zhang, Juyang
    Sun, Jigui
    Yang, Qingyun
    [J]. INTERNATIONAL JOURNAL OF COMPUTER SCIENCE AND NETWORK SECURITY, 2006, 6 (2A): : 237 - 241
  • [7] Resource-constrained repetitive project scheduling with soft logic
    Zou, Xin
    Rong, Zhuang
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024,
  • [8] Flexible Scheduling Approach for Resource-Constrained Project Scheduling Problems
    Liu, Shixin
    Tukel, Oya I.
    Rom, W.
    [J]. 2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 3522 - +
  • [9] A constraint programming approach for the resource-constrained project scheduling problem
    Liess, Olivier
    Michelon, Philippe
    [J]. ANNALS OF OPERATIONS RESEARCH, 2008, 157 (01) : 25 - 36
  • [10] A Constraint Integer Programming Approach for Resource-Constrained Project Scheduling
    Berthold, Timo
    Heinz, Stefan
    Luebbecke, Marco E.
    Moehring, Rolf H.
    Schulz, Jens
    [J]. INTEGRATION OF AI AND OR TECHNIQUES IN CONSTRAINT PROGRAMMING FOR COMBINATORIAL OPTIMIZATION PROBLEMS, 2010, 6140 : 313 - +