THE TRAIT ANALYSIS OF CFG COMPOSITE FOUNDATION OF THE BEIJING-SHANGHAI HIGH-SPEED RAILWAY

被引:0
|
作者
Lei Jin-shan [1 ]
Yang Xiu-zhu [1 ]
Chending [1 ]
机构
[1] Cent S Univ, Sch Civil Engn & Architecture, Changsha 410075, Hunan, Peoples R China
关键词
CFG pile composite foundation; FLAC3D; Numerical analysis; settlement;
D O I
暂无
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
FLAC3D is used to simulate the CFG pile reinforced subgrade's filling process at the typical geological conditon of the Beijing-Shanghai high-speed Railway, which considers the pile and soil as different materials. Comparing the measured settlement and the calculated verifies the feasibility of the computational model. This modle is used to analyze the effect of the different pile length and space to the subgrade's settlement. According to their settlements, CFG pile's reasonable length and space are confirmed.
引用
收藏
页码:343 / 349
页数:7
相关论文
共 50 条
  • [41] An Analysis of the Competitiveness of High Speed Rail in the Beijing-Shanghai Market
    Gao, Yi
    Zhang, Chrystal B.
    Bruce, Peter
    [J]. 2012 WORLD AUTOMATION CONGRESS (WAC), 2012,
  • [42] Long-term monitoring technology of beijing-shanghai high-speed railway elevated station track system
    Beijing Jiaotong University, Beijing
    100044, China
    [J]. J. Railw. Eng. Soc., 5 (35-41):
  • [43] Synthetical Benefit Evaluation of High-Speed Rail, Take Beijing-Shanghai High-Speed Rail for Example
    Jin, Han-bo
    Feng, Hua
    Cui, Fu-guang
    [J]. LTLGB 2012: PROCEEDINGS OF INTERNATIONAL CONFERENCE ON LOW-CARBON TRANSPORTATION AND LOGISTICS, AND GREEN BUILDINGS. VOL 1, 2013, : 395 - 402
  • [44] In situ health monitoring for bogie systems of CRH380 train on Beijing-Shanghai high-speed railway
    Hong, Ming
    Wang, Qiang
    Su, Zhongqing
    Cheng, Li
    [J]. MECHANICAL SYSTEMS AND SIGNAL PROCESSING, 2014, 45 (02) : 378 - 395
  • [45] Monitoring and Analysis of Railway Bridge Pier Deformation of Municipal Engineering Crossing Underneath Beijing-Shanghai High Speed Railway
    Zhang, Yuzhi
    Du, Yanliang
    Sun, Baochen
    [J]. TRENDS IN CIVIL ENGINEERING, PTS 1-4, 2012, 446-449 : 3534 - +
  • [46] TECHNOLOGIES OF CONSTRUCTION AND SETTLEMENT CONTROL FOR TRANSITION SECTION BETWEEN SUBGRADE AND CULVERT IN BEIJING-SHANGHAI HIGH-SPEED RAILWAY
    Da, Zhihua
    Shen, Yupeng
    Wang, Huihuang
    Fu, Xiaoyan
    [J]. CONSTRUCTION AND MAINTENANCE OF RAILWAY INFRASTRUCTURE IN COMPLEX ENVIRONMENT, 2014, : 305 - 310
  • [47] Durability and Safety Protection Design of a Steel Truss Girder Bridge Crossing Beijing-Shanghai High-Speed Railway
    Xue X.-Z.
    [J]. Bridge Construction, 2023, 53 (01) : 116 - 122
  • [48] Research on Stress Distribution of CFG Pile-net Composite Foundation in High-speed Railway
    Cheng, Jun
    Zhang, Jiwen
    [J]. SUSTAINABLE CITIES DEVELOPMENT AND ENVIRONMENT PROTECTION, PTS 1-3, 2013, 361-363 : 1833 - 1837
  • [49] DISCUSSING ON SETTLEMENT CALCULATION PROBLEM OF CFG PILE COMPOSITE FOUNDATION IN HIGH-SPEED RAILWAY STATION
    Luan, Guangri
    Wang, Lianjun
    Wen, Shicong
    Cheng, Yimei
    [J]. NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 403 - 407
  • [50] Composite Foundation on bearing Characteristics and Simulation Analysis CFG Pile for the High Speed Railway
    Jiang, Alan
    Wang, Meixia
    [J]. FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 3827 - 3831