A tabu search algorithm for simultaneous machine/AGV scheduling problem

被引:115
|
作者
Zheng, Yan [1 ]
Xiao, Yujie [2 ]
Seo, Yoonho [1 ]
机构
[1] Korea Univ, Dept Ind & Management Engn, Seoul, South Korea
[2] Nanjing Univ Finance & Econ, Sch Mkt & Logist Management, Nanjing, Jiangsu, Peoples R China
关键词
simultaneous scheduling; machines scheduling; AGVs scheduling; tabu search; AUTOMATED GUIDED VEHICLES; DESIGN; SYSTEM; AGVS; FMS;
D O I
10.1080/00207543.2014.910628
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Machines and automated guided vehicles (AGVs) scheduling problems are two essential issues that need to be addressed for the efficiency of the overall production system. The purpose of this paper is to study the simultaneous scheduling problem of machines and AGVs in a flexible manufacturing system (FMS) since the global optimum cannot be reached by considering each of them individually. In this paper, a mixed integer linear programming (MILP) model is developed with the objective of makespan minimisation. The MILP model consists of the following two constraint sets: machines and AGVs scheduling sub-problems. As both sub-problems are known to be NP-hard, a heuristic algorithm based on tabu search (TS) is proposed to get optimal or near to optimal solution for large-size problems within reasonable computation time. The proposed algorithm includes a novel two-dimensional solution representation and the generation of two neighbour solutions, which are alternately and iteratively applied to improve solutions. Moreover, an improved lower bound calculation method is introduced for the large-size problems. Computational results show the superior performance of the TS algorithm for the simultaneous scheduling problem.
引用
收藏
页码:5748 / 5763
页数:16
相关论文
共 50 条
  • [21] Tabu search algorithm for vehicle routing problem with simultaneous deliveries and pickups
    College of Economics and Management, Southeast University, Nanjing 210096, China
    不详
    不详
    Xitong Gongcheng Lilum yu Shijian, 2007, 6 (117-123):
  • [22] TABU SEARCH FOR A SINGLE MACHINE SCHEDULING PROBLEM WITH DISCRETELY CONTROLLABLE RELEASE DATES
    Thevenin, S.
    Zufferey, N.
    Widmer, M.
    SOR'13 PROCEEDINGS: THE 12TH INTERNATIONAL SYMPOSIUM ON OPERATIONAL RESEARCH IN SLOVENIA, 2013, : 103 - 108
  • [23] A tabu search algorithm for the unrelated parallel machine scheduling problem with machine availability constraint and sequence-dependent setup time
    Furugi, Ahad
    JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY, 2021, 36 (03): : 1540 - 1549
  • [24] A TABU SEARCH ALGORITHM FOR THE CELL FORMATION PROBLEM WITH PART MACHINE SEQUENCING
    Papaioannou, G.
    Wilson, J. M.
    FOUNDATIONS OF COMPUTING AND DECISION SCIENCES, 2012, 37 (02) : 97 - 127
  • [25] A tabu search algorithm for the single machine total weighted tardiness problem
    Bilge, Umit
    Kurtulan, Mujde
    Kirac, Furkan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 176 (03) : 1423 - 1435
  • [26] Parallel Neuro-Tabu Search Algorithm for the Job Shop Scheduling Problem
    Bozejko, Wojciech
    Uchronski, Mariusz
    Wodecki, Mieczyslaw
    ARTIFICIAL INTELLIGENCE AND SOFT COMPUTING, PT II, 2013, 7895 : 489 - 499
  • [27] An iterative layered tabu search algorithm for complex job shop scheduling problem
    Liu, M
    Dong, MY
    Wu, C
    CHINESE JOURNAL OF ELECTRONICS, 2005, 14 (03): : 519 - 523
  • [28] Variable neighborhood tabu search algorithm for integrated imaging satellites scheduling problem
    Li, Ju-Fang
    He, Ren-Jie
    Yao, Feng
    Tan, Yue-Jin
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2013, 33 (12): : 3040 - 3044
  • [29] A tabu search algorithm for solving a multicriteria flexible job shop scheduling problem
    Vilcot, Geoffrey
    Billaut, Jean-Charles
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (23) : 6963 - 6980
  • [30] A new Tabu Search algorithm for the long-term hydro scheduling problem
    Mantawy, AH
    Soliman, SA
    El-Hawary, ME
    LESCOPE'02: 2002 LARGE ENGINEERINGS SYSTEMS CONFERENCE ON POWER ENGINEERING, CONFERENCE PROCEEDINGS, 2002, : 29 - 34