Statistical gain-scheduling method for aircraft flight simulation

被引:6
|
作者
Choi, Youngjun [1 ]
Jimenez, Hernando [1 ]
Mavris, Dimitri N. [2 ,3 ]
机构
[1] Georgia Inst Technol, Sch Aerosp Engn, Atlanta, GA 30332 USA
[2] Georgia Inst Technol, Sch Aerosp Engn, Adv Aerosp Syst Anal, Atlanta, GA 30332 USA
[3] Georgia Inst Technol, Aerosp Syst Design Lab, Atlanta, GA 30332 USA
关键词
Gain-scheduling method; Surrogate model; Aircraft control; Regression technique;
D O I
10.1016/j.ast.2015.08.011
中图分类号
V [航空、航天];
学科分类号
08 ; 0825 ;
摘要
A global polynomial variable scheduling method for aircraft controller is proposed to achieve runtime benefits with no degradation of controller stability. The method is benchmarked against two conventional methods: nearest neighbor and bilinear interpolation. An examination of conventional method constructs reveals recursive local approximation generation as the most expensive step, whereas discontinuities and lack of first derivative smoothness lead to poor approximations. The proposed method features a multivariate polynomial as the variable scheduling mechanism that addresses both drawbacks concurrently and achieves significant runtime improvements by virtue of its very simple functional form. The mathematical formulation of the proposed approach is discussed along with practical considerations for implementation. Numerical flight dynamics simulations are conducted with the three methods for four flight maneuvers and using four scheduling variable sets of increasing resolution. Results show the proposed method significantly reduces runtime relative to nearest neighbor, and even more so relative to bilinear interpolation. Results also indicate comparable controller stability in terms of deviation from margins of optimum solutions. (C) 2015 Elsevier Masson SAS. All rights reserved.
引用
收藏
页码:493 / 505
页数:13
相关论文
共 50 条
  • [21] Stable gain-scheduling on endogenous signals
    Rasmussen, BP
    Alleyne, AG
    ACC: PROCEEDINGS OF THE 2005 AMERICAN CONTROL CONFERENCE, VOLS 1-7, 2005, : 1895 - 1900
  • [22] An implicit gain-scheduling controller for cranes
    Corriga, G
    Giua, A
    Usai, G
    IEEE TRANSACTIONS ON CONTROL SYSTEMS TECHNOLOGY, 1998, 6 (01) : 15 - 20
  • [23] Tracking control of a mobile robot using gain-scheduling control method
    Kwon, Hae-Yeong
    Choi, Ho-Lim
    Choi, H.-L. (hlchoi@dau.ac.kr), 1600, Korean Institute of Electrical Engineers (62): : 401 - 406
  • [24] An initial study of gain-scheduling controller design for NCS using delay statistical model
    Fei, Minrui
    Zhou, Xiaobing
    Yang, T. C.
    Tan, Yuemei
    Wang, Heshou
    COMPUTATIONAL INTELLIGENCE, PT 2, PROCEEDINGS, 2006, 4114 : 1049 - 1060
  • [25] Robust Gain-Scheduling Control with Guaranteed Performance
    Al-Jiboory, Ali K.
    Zhu, Guoming G.
    IFAC PAPERSONLINE, 2016, 49 (18): : 528 - 533
  • [26] Gain-scheduling control for extending space structures
    Li, Kouen
    Nagasio, Tomoyuki
    Kida, Takashi
    Nippon Kikai Gakkai Ronbunshu, C Hen/Transactions of the Japan Society of Mechanical Engineers, Part C, 2004, 70 (05): : 1401 - 1408
  • [27] A synthesis framework for robust gain-scheduling controllers
    Veenman, Joost
    Scherer, Carsten W.
    AUTOMATICA, 2014, 50 (11) : 2799 - 2812
  • [28] Advanced gain-scheduling techniques for uncertain systems
    Apkarian, P
    Adams, RJ
    IEEE TRANSACTIONS ON CONTROL SYSTEMS TECHNOLOGY, 1998, 6 (01) : 21 - 32
  • [29] Gain-scheduling for systems with repeated scalar nonlinearities
    Chu, YC
    Glover, K
    PROCEEDINGS OF THE 36TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-5, 1997, : 406 - 411
  • [30] Gain-scheduling control of the Switched Reluctance Motor
    Ho, WK
    Panda, SK
    Lim, KW
    Huang, FS
    CONTROL ENGINEERING PRACTICE, 1998, 6 (02) : 181 - 189