Key constraints and mitigation strategies for prefabricated prefinished volumetric construction

被引:196
|
作者
Hwang, Bon-Gang [1 ]
Shan, Ming [2 ]
Looi, Kit-Ying [3 ]
机构
[1] Natl Univ Singapore, Dept Bldg, 4 Architecture Dr, Singapore 117566, Singapore
[2] Cent S Univ, Sch Civil Engn, 68 South Shaoshan Rd, Changsha 410075, Hunan, Peoples R China
[3] Arcadis Singapore Pte Ltd, Quant Surveyor, 1 Magazine Rd,05-01 Cent Mall, Singapore 059567, Singapore
关键词
Prefabricated prefinished volumetric; construction; Prefabrication; Off-site construction; Constraints; Mitigation strategies; Singapore; OFF-SITE PRODUCTION; OFFSITE CONSTRUCTION; DEVELOPING-COUNTRIES; UK HOUSEBUILDERS; PERFORMANCE; BUILDINGS; DESIGN; OPTIMIZATION; ENVIRONMENT; INTEGRATION;
D O I
10.1016/j.jclepro.2018.02.136
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Prefabricated prefinished volumetric construction (PPVC) is an innovative and cleaner approach that has restructured the production of the construction industry. It can improve the workflow continuity, increase the efficiencies in the use of resources, minimize construction wastes, and reduce the number of on-site contractors as well as construction durations. While the benefits of PPVC have been widely recognized over past two decades, the constraints on using PPVC remains unexplored. As a result, the aims of this study are to investigate the significant constraints demotivating the adoption of PPVC and to propose a group of feasible mitigation strategies to tackle these constraints. To achieve these goals, a comprehensive literature review was conducted first, followed by a structured questionnaire survey administered to 41 Singapore-based construction organizations. Lastly, an in-depth case study was conducted to verify the empirical findings. The analysis results showed that the top five significant constraints were "extensive coordination required prior to and during construction", "need for additional project planning and design efforts", "increased transportation and logistics considerations", "requirement for early commitment", and "higher initial cost than conventional construction method." It also revealed the top three most effective mitigation strategies: "encouraging close collaborations between project stakeholders during the early phase of the project", "use of BIM to improve coordination and facilitate communication among project stakeholders", and "offering training courses for project team and workers to enhance their knowledge and skills". This study contributes to the body of knowledge by examining the constraints and mitigation strategies for the adoption of PPVC. Also, the findings from this study are informative to the industry practitioners to have a better understanding and implementation of PPVC. (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页码:183 / 193
页数:11
相关论文
共 50 条
  • [1] Prefabricated Prefinished Volumetric Construction: Key Constraints and Mitigation Strategies
    Liu, W. Q.
    Hwang, B. G.
    Shan, M.
    Looi, K. Y.
    [J]. 4TH INTERNATIONAL CONFERENCE ON RESEARCH METHODOLOGY FOR BUILT ENVIRONMENT AND ENGINEERING 2019, 2019, 385
  • [2] Stakeholder management in prefabricated prefinished volumetric construction projects: benchmarking the key result areas
    Wuni, Ibrahim Yahaya
    Shen, Geoffrey Qiping
    [J]. BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2020, 10 (03) : 407 - 421
  • [3] Development of an innovative FlexLock Connector for prefabricated prefinished volumetric construction
    Lian, Jun-Yi
    Zhang, Wen-Yuan
    Ding, Yu-Kun
    [J]. STRUCTURES, 2024, 68
  • [4] Evaluating the critical success criteria for prefabricated prefinished volumetric construction projects
    Wuni, Ibrahim Yahaya
    Shen, Geoffrey Qiping
    Osei-Kyei, Robert
    [J]. JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2021, 26 (02) : 279 - 297
  • [5] Seismic performance of connection joints between prefabricated prefinished volumetric construction
    Yan Q.-F.
    Zhang J.-G.
    Wang T.
    Chen D.-G.
    Yu Y.-S.
    Yang Y.-C.
    [J]. Jilin Daxue Xuebao (Gongxueban)/Journal of Jilin University (Engineering and Technology Edition), 2023, 53 (02): : 505 - 514
  • [6] The Intelligent use of RFID and BIM in Prefabricated, Prefinished, Volumetric Construction Work Flow
    Abbott, Ernest L. S.
    Chua, David K. H.
    [J]. 9TH INTERNATIONAL CONFERENCE ON ENGINEERING, PROJECT, AND PRODUCTION MANAGEMENT (EPPM2018), 2020, 312
  • [7] Knowledge-based decision support system for prefabricated prefinished volumetric construction
    Hwang, Bon-Gang
    Shan, Ming
    Looi, Kit-Ying
    [J]. AUTOMATION IN CONSTRUCTION, 2018, 94 : 168 - 178
  • [8] Robustness of Prefabricated Prefinished Volumetric Construction (PPVC) High-rise Building
    Chua, Y. S.
    Liew, J. Y. R.
    Pang, S. D.
    [J]. PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON ADVANCES IN STEEL-CONCRETE COMPOSITE STRUCTURES (ASCCS 2018), 2018, : 913 - 919
  • [9] Developing a Knowledge-based Decision Support System for Prefabricated Prefinished Volumetric Construction
    Li, Y. S.
    Hwang, B. G.
    Shan, M.
    Looi, K. Y.
    [J]. 4TH INTERNATIONAL CONFERENCE ON RESEARCH METHODOLOGY FOR BUILT ENVIRONMENT AND ENGINEERING 2019, 2019, 385
  • [10] Deep-Learning-Based Automated Building Construction Progress Monitoring for Prefabricated Prefinished Volumetric Construction
    Chua, Wei Png
    Cheah, Chien Chern
    [J]. Sensors, 2024, 24 (21)