Robustness of Prefabricated Prefinished Volumetric Construction (PPVC) High-rise Building

被引:22
|
作者
Chua, Y. S. [1 ]
Liew, J. Y. R. [1 ,2 ]
Pang, S. D. [1 ]
机构
[1] Natl Univ Singapore, Dept Civil & Environm Engn, Singapore, Singapore
[2] Nanjing Tech Univ, Coll Civil Engn, Nanjing, Jiangsu, Peoples R China
基金
新加坡国家研究基金会;
关键词
Modular; High-rise; Robustness; Column removal; Pushdown; PROGRESSIVE COLLAPSE; COLUMN LOSS; FRAMES;
D O I
10.4995/ASCCS2018.2018.6955
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Due to the safety awareness arisen from natural and human-caused disasters, robustness design of building is increasingly important to ensure the stability of the building and to prevent progressive collapse. For this reason, the robustness design of innovative construction technologies such as modular construction may be essential due to its relative novel structural form and numerous joints among modules. Particularly in Singapore, Prefabricated Prefinished Volumetric Construction ( PPVC) has been highly promoted in residential and commercial buildings, hostels and hospitals to boost the construction productivity and quality as well as to reduce the reliance on foreign workforce. PPVC offers high quality and efficiency because most of the finishes and mechanical and electrical services are manufactured and installed together with the modules in factory, before sending for on-site assembly. To maximize the productivity of PPVC, modular design standardization and repetition can be improved by going for high-rise. Nonetheless, there are limited studies on the robustness of PPVC high-rise building and its behavior under progressive collapse remains uncertain. Therefore, this paper investigates the robustness of steel PPVC high-rise building under column removal scenarios by conducting non-linear numerical analysis. The effects of joint design and diaphragm action between modules are studied to ensure continuity of horizontal and vertical tying. This paper provides insight on the behaviour and alternative path for load transfer under column removal scenario for future design guideline of robustness PPVC building.
引用
下载
收藏
页码:913 / 919
页数:7
相关论文
共 50 条
  • [1] Key constraints and mitigation strategies for prefabricated prefinished volumetric construction
    Hwang, Bon-Gang
    Shan, Ming
    Looi, Kit-Ying
    JOURNAL OF CLEANER PRODUCTION, 2018, 183 : 183 - 193
  • [2] Deep-Learning-Based Automated Building Construction Progress Monitoring for Prefabricated Prefinished Volumetric Construction
    Chua, Wei Png
    Cheah, Chien Chern
    Sensors, 2024, 24 (21)
  • [3] Prefabricated Prefinished Volumetric Construction: Key Constraints and Mitigation Strategies
    Liu, W. Q.
    Hwang, B. G.
    Shan, M.
    Looi, K. Y.
    4TH INTERNATIONAL CONFERENCE ON RESEARCH METHODOLOGY FOR BUILT ENVIRONMENT AND ENGINEERING 2019, 2019, 385
  • [4] Development of an innovative FlexLock Connector for prefabricated prefinished volumetric construction
    Lian, Jun-Yi
    Zhang, Wen-Yuan
    Ding, Yu-Kun
    STRUCTURES, 2024, 68
  • [5] Evaluating the critical success criteria for prefabricated prefinished volumetric construction projects
    Wuni, Ibrahim Yahaya
    Shen, Geoffrey Qiping
    Osei-Kyei, Robert
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2021, 26 (02) : 279 - 297
  • [6] Seismic performance of connection joints between prefabricated prefinished volumetric construction
    Yan Q.-F.
    Zhang J.-G.
    Wang T.
    Chen D.-G.
    Yu Y.-S.
    Yang Y.-C.
    Jilin Daxue Xuebao (Gongxueban)/Journal of Jilin University (Engineering and Technology Edition), 2023, 53 (02): : 505 - 514
  • [7] The Intelligent use of RFID and BIM in Prefabricated, Prefinished, Volumetric Construction Work Flow
    Abbott, Ernest L. S.
    Chua, David K. H.
    9TH INTERNATIONAL CONFERENCE ON ENGINEERING, PROJECT, AND PRODUCTION MANAGEMENT (EPPM2018), 2020, 312
  • [8] Knowledge-based decision support system for prefabricated prefinished volumetric construction
    Hwang, Bon-Gang
    Shan, Ming
    Looi, Kit-Ying
    AUTOMATION IN CONSTRUCTION, 2018, 94 : 168 - 178
  • [9] Construction Technology of High-rise Building Structure
    Cheng, Peng
    Chen, Xinfu
    Wu, Lang
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 2316 - +
  • [10] Stakeholder management in prefabricated prefinished volumetric construction projects: benchmarking the key result areas
    Wuni, Ibrahim Yahaya
    Shen, Geoffrey Qiping
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2020, 10 (03) : 407 - 421