共 50 条
- [1] Getting ready for the simulation revolution in 300mm fab productivity! [J]. ISSM 2005: IEEE International Symposium on Semiconductor Manufacturing, Conference Proceedings, 2005, : 348 - 351
- [2] 300mm prime gaps that need to be addressed to boost productivity [J]. ISSM 2007: 2007 INTERNATIONAL SYMPOSIUM ON SEMICONDUCTOR MANUFACTURING, CONFERENCE PROCEEDINGS, 2007, : 267 - +
- [3] Realizing 300mm FAB productivity improvements through integrated metrology [J]. PROCEEDINGS OF THE 2002 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2002, : 1369 - 1376
- [4] CIM for 300mm semiconductor fab [J]. PROCESS, EQUIPMENT, AND MATERIALS CONTROL IN INTEGRATED CIRCUIT MANUFACTURING III, 1997, 3213 : 162 - 170
- [5] Sorter automatic operations in a 300mm fab [J]. 2002 SEMICONDUCTOR MANUFACTURING TECHNOLOGY WORKSHOP, 2002, : 119 - 122
- [7] AMD builds 300mm fab in Germany [J]. INFORMACIJE MIDEM-JOURNAL OF MICROELECTRONICS ELECTRONIC COMPONENTS AND MATERIALS, 2004, 34 (01): : 77 - 77
- [8] Optimization of a simulation for 300mm FAB semiconductor manufacturing [J]. COMPUTATIONAL SCIENCE AND ITS APPLICATIONS - ICCSA 2006, PT 5, 2006, 3984 : 260 - 268
- [9] Hierarchical distributed simulation for 300mm wafer fab [J]. PROCEEDINGS OF THE 2007 WINTER SIMULATION CONFERENCE, VOLS 1-5, 2007, : 1753 - 1759
- [10] Test wafer control system in 300mm FAB [J]. 2004 SEMICONDUCTOR MANUFACTURING TECHNOLOGY WORKSHOP PROCEEDINGS, 2004, : 33 - 36