Searching for greater fab productivity with 300mm Prime

被引:0
|
作者
Fosnight, William [1 ]
Hofmeister, Christopher [1 ]
机构
[1] Brooks Automat, Semicond Prod Grp, Chelmsford, MA 01824 USA
关键词
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The ability to improve IC manufacturing costs has been one of the great success stories of the semiconductor industry. The dramatic reduction in cost per transistor has been enabled by vast technology innovation. Recent data indicates that the semiconductor industry is poised to depart from the historic rate of productivity improvement [1]. One potential way to improve productivity is to reduce fab cycle time. With these challenges in mind, International SEMATECH Manufacturing Initiative (ISMI) began its 300mm Prime initiative to address fab productivity challenges going forward and ensure that the industry does not fall behind its historic rate of improvement [2].
引用
收藏
页码:89 / +
页数:3
相关论文
共 50 条
  • [1] Getting ready for the simulation revolution in 300mm fab productivity!
    Collins, DW
    Williams, K
    Dye, B
    [J]. ISSM 2005: IEEE International Symposium on Semiconductor Manufacturing, Conference Proceedings, 2005, : 348 - 351
  • [2] 300mm prime gaps that need to be addressed to boost productivity
    Marshall, Les
    Rust, Kristin
    Schmidt, Kilian
    [J]. ISSM 2007: 2007 INTERNATIONAL SYMPOSIUM ON SEMICONDUCTOR MANUFACTURING, CONFERENCE PROCEEDINGS, 2007, : 267 - +
  • [3] Realizing 300mm FAB productivity improvements through integrated metrology
    Stanley, KJ
    Stanley, TD
    Maia, J
    [J]. PROCEEDINGS OF THE 2002 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2002, : 1369 - 1376
  • [4] CIM for 300mm semiconductor fab
    Luk, A
    [J]. PROCESS, EQUIPMENT, AND MATERIALS CONTROL IN INTEGRATED CIRCUIT MANUFACTURING III, 1997, 3213 : 162 - 170
  • [5] Sorter automatic operations in a 300mm fab
    Wang, YC
    Ho, D
    Wu, CS
    Jann, L
    [J]. 2002 SEMICONDUCTOR MANUFACTURING TECHNOLOGY WORKSHOP, 2002, : 119 - 122
  • [6] Mitsubishi to build 300mm fab in Kochi
    不详
    [J]. SOLID STATE TECHNOLOGY, 2001, : S35 - S35
  • [7] AMD builds 300mm fab in Germany
    不详
    [J]. INFORMACIJE MIDEM-JOURNAL OF MICROELECTRONICS ELECTRONIC COMPONENTS AND MATERIALS, 2004, 34 (01): : 77 - 77
  • [8] Optimization of a simulation for 300mm FAB semiconductor manufacturing
    Park, DongSik
    Han, Youngshin
    Lee, Chilgee
    [J]. COMPUTATIONAL SCIENCE AND ITS APPLICATIONS - ICCSA 2006, PT 5, 2006, 3984 : 260 - 268
  • [9] Hierarchical distributed simulation for 300mm wafer fab
    Xu, Sheng
    McGinnis, Leon F.
    [J]. PROCEEDINGS OF THE 2007 WINTER SIMULATION CONFERENCE, VOLS 1-5, 2007, : 1753 - 1759
  • [10] Test wafer control system in 300mm FAB
    Hsu, JW
    Lo, HL
    Pan, CC
    Chen, YM
    Hsieh, TK
    [J]. 2004 SEMICONDUCTOR MANUFACTURING TECHNOLOGY WORKSHOP PROCEEDINGS, 2004, : 33 - 36