The value of project risk management

被引:1
|
作者
de Klerk, AM [1 ]
机构
[1] Univ Pretoria, Fac Engn, Dept Engn & Technol Management, ZA-0001 Pretoria, South Africa
关键词
D O I
10.1109/PICMET.2001.952241
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Managing project risk costs money. This paper considers the bottom-line justification for project risk management and the question of whether there is some optimal level of investment in this activity. Few guidelines exist as to how an appropriate balance between risks and rewards can be achieved. This paper develops a simple model based on utility theory which can be used to compare the benefits of risk-reduction with its costs. An expected utility measure is more appropriate than expected value because it reflects the risk attitude of the organisation involved. The relevance and application of the concepts of the value of information and the value of control are also examined in the context of project risk management.
引用
收藏
页码:570 / 576
页数:7
相关论文
共 50 条
  • [31] The Application of Earned Value in Project Management
    Lv, Xiuling
    Wu, Jiangfeng
    ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 2844 - 2847
  • [32] The value management project, part II
    Marshall, Stephen J.
    SMT Surface Mount Technology Magazine, 2010, 25 (08): : 62 - 66
  • [33] Project Success Factors and Value Management
    Gagsch, Bernd
    Schuele, Jutta
    WASSERWIRTSCHAFT, 2016, 106 (10) : 12 - 17
  • [34] Project Management Models as Value Creators
    Eskerod, Pernille
    Riis, Eva
    PROJECT MANAGEMENT JOURNAL, 2009, 40 (01) : 4 - 18
  • [35] The value management project, part I
    Marshall, Stephen J.
    SMT Surface Mount Technology Magazine, 2010, 25 (06): : 24 - 33
  • [36] Project Management for the Creation of Organisational Value
    Dalcher, Darren
    PROJECT MANAGEMENT JOURNAL, 2012, 43 (03) : 79 - 79
  • [37] The Berkeley Project Management Process Maturity Model: Measuring the value of project management
    Kwak, YH
    Ibbs, CW
    EMS - 2000: PROCEEDINGS OF THE 2000 IEEE ENGINEERING MANAGEMENT SOCIETY, 2000, : 1 - 5
  • [38] The downside risk of project portfolios: The impact of capital investment projects and the value of project efficiency and project risk management programmes (vol 34, pg 1460, 2016)
    Paquin, Jean-Paul
    Gauthier, Celine
    Morin, Pierre-Paul
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2018, 36 (08) : 1050 - 1053
  • [39] Using Earned Value Management and Schedule Risk Analysis with resource constraints for project control
    Song, Jie
    Martens, Annelies
    Vanhoucke, Mario
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 297 (02) : 451 - 466
  • [40] RECOGNITION OF THE ROLE AND VALUE OF CHANGE MANAGEMENT IN PROJECT MANAGEMENT
    Sabau, Gheorghe
    Carstea, Claudia
    INTERNATIONAL CONFERENCE ON INFORMATICS IN ECONOMY, 2013, : 431 - 436