Deformation Process and Mechanism Analyses of a Rock Slope Based on Long-Term Monitoring at the Pubugou Hydropower Station, China

被引:2
|
作者
Mei, Xuefeng [1 ]
Wang, Nengfeng [2 ]
Ma, Guotao [3 ]
Wang, Jie [4 ]
Wang, Yan [3 ]
Wu, Jianli [3 ]
Han, Mei [5 ]
Cai, Bin [2 ]
机构
[1] Shandong Univ Technol, Sch Civil & Architectural Engn, Zibo 255049, Peoples R China
[2] Power China Chengdu Engn Corp Ltd, Chengdu 610072, Peoples R China
[3] Southwest Jiaotong Univ, Fac Geosci & Environm Engn, Chengdu 610031, Peoples R China
[4] Sichuan Inst Geol Engn Invest Grp Co Ltd, Chengdu 610072, Peoples R China
[5] Southwest Jiaotong Univ, Sch Math, Chengdu 610031, Sichuan, Peoples R China
基金
中国国家自然科学基金;
关键词
D O I
10.1155/2021/6615424
中图分类号
P3 [地球物理学]; P59 [地球化学];
学科分类号
0708 ; 070902 ;
摘要
This paper presents a typical 450 m high rock slope in a highly jointed and fractured rock mass at Pubugou (PBG) hydropower station on the Dadu River. We established a set of multiphase field geological survey combined with GPS, inclinometers, and piezometer monitoring system to analyze the deformation and failure mechanism of rock slope. The results show that small-scale excavation in road construction disrupted the balance of the Pubugou rock slope (PBGRS), and several local retrogressive failures occurred at the toe. Monitoring data regarding surface and subsurface movements show that the PBGRS is stable as a whole. The deformation concentrated mainly in the loosened fractured zone, which was a feature with sliding-compression cracking. Highly loosened rock mass was the predominant factor affecting the stability of the PBGRS, while the role of reservoir water level fluctuation, though positive, was not significant. Overall, the PBGRS still has a high potential for further development, especially in the slope's upper zone. To reinforce the slope, measurements mainly consist of the concrete frame combined with anchor cables constructed on the slope. In this study, the analysis was carried out of pre- and postreinforcement measure slope stability with numerical simulation, and safety factor increased from 1.09 to 1.21. This study's findings have important implications to the analytical method and reinforcement design with geological settings like that of the PBGRS.
引用
收藏
页数:17
相关论文
共 50 条
  • [41] In situ creep tests on the long-term shear behaviors of a fault located at the dam foundation of Dagangshan hydropower station, China
    Yang, Wendong
    Duan, Kang
    Zhang, Qiangyong
    Jiao, Yuyong
    Wang, Shugang
    ENERGY SCIENCE & ENGINEERING, 2020, 8 (01) : 216 - 235
  • [42] Long-Term Bidding Scheduling of a Price-Maker Cascade Hydropower Station Based on Supply Function Equilibrium
    Liu, Gang
    Ma, Guangwen
    Huang, Weibin
    Chen, Shijun
    Mathematical Problems in Engineering, 2022, 2022
  • [43] Long-Term Bidding Scheduling of a Price-Maker Cascade Hydropower Station Based on Supply Function Equilibrium
    Liu, Gang
    Ma, Guangwen
    Huang, Weibin
    Chen, Shijun
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022
  • [44] Long-Term Bidding Scheduling of a Price-Maker Cascade Hydropower Station Based on Supply Function Equilibrium
    Liu, Gang
    Ma, Guangwen
    Huang, Weibin
    Chen, Shijun
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022
  • [45] A long-term cruise monitoring system for marine ranching based on surface docking station
    Zhang, Zhuoyu
    Li, Dejun
    Lin, Mingwei
    Zhao, Yucheng
    Wu, Rundong
    Chu, Shuguang
    2022 OCEANS HAMPTON ROADS, 2022,
  • [46] Deformation features of a long-span arch bridge based on long-term monitoring data
    Zhou, G. D.
    Liu, D. K.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, LIFE-CYCLE SUSTAINABILITY AND INNOVATIONS, 2021, : 2279 - 2284
  • [47] Displacement Measurements and Numerical Analysis of Long-Term Rock Slope Deformation at Higashi-Shikagoe Limestone Quarry, Japan
    Amagu, Clement A.
    Zhang, Cheng
    Kodama, Jun-ichi
    Shioya, Kazuyuki
    Yamaguchi, Tomoyuki
    Sainoki, Atsushi
    Fukuda, Daisuke
    Fujii, Yoshiaki
    Sharifzadeh, Mostafa
    ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [48] Time-dependent deformation of rock slopes based on long-term strength characteristics of rocks
    Li, Lian-Chong
    Li, Shao-Hua
    Li, Hong
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2014, 36 (01): : 47 - 56
  • [49] Mechanism of the effect of temperature on frequency based on long-term monitoring of an arch bridge
    Teng, Jun
    Tang, De-Hui
    Hu, Wei-Hua
    Lu, Wei
    Feng, Zhi-Wen
    Ao, Chun-Feng
    Liao, Ming-Hao
    STRUCTURAL HEALTH MONITORING-AN INTERNATIONAL JOURNAL, 2021, 20 (04): : 1716 - 1737
  • [50] The Benner pass rock avalanche cluster suggests a close relation between long-term slope deformation (DSGSDs and translational rock slides) and catastrophic failure
    Ostermann, Marc
    Sanders, Diethard
    GEOMORPHOLOGY, 2017, 289 : 44 - 59