Transient Analysis of Multiproduct Bernoulli Serial Lines With Setups

被引:11
|
作者
Wang, Mengyue [1 ,2 ]
Huang, Hongxuan [1 ]
Li, Jingshan [2 ]
机构
[1] Tsinghua Univ, Dept Ind Engn, Beijing 100084, Peoples R China
[2] Univ Wisconsin, Dept Ind & Syst Engn, Madison, WI 53706 USA
关键词
Bernoulli reliability model; multiproduct; serial line; setup; transient analysis;
D O I
10.1109/TASE.2019.2963145
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Performance analysis of flexible manufacturing systems has received substantial research attention. Most of the studies focus on steady-state behavior. The transient performance, which is critical for system operation, control, and improvement, is less investigated. No analytical method is available to evaluate the transients in flexible lines with unreliable machines, finite buffers, and setup times. In this article, an analytical model is introduced to study the transient performance of multiproduct serial lines with Bernoulli reliability machines and nonnegligible setups during changeovers. To reduce the state-space dimension, an approximation method is introduced to evaluate the performance in two-machine lines, where the sequence of multiple part types in the inventory is approximated by the ratio of product mix. Such an approximation method leads to high precision of production rate estimation. Then, for longer lines, the analysis approach in two-machine lines is used as a building block in an iterative aggregation procedure. Numerical experiments show that the iteration procedure is convergent and results in an acceptable accuracy in performance evaluation. In addition, system properties, such as monotonicity and reversibility, are investigated. Note to Practitioners-Manufacturing systems become more and more flexible, where multiple types of products are made on the same production lines. Although significant efforts have been devoted to studying flexible manufacturing systems (FMSs), most of the research contribute to the steady-state analysis. However, the transient performance is of critical importance for control and improvement of flexible systems, particularly, when the system's setup times cannot be ignored. Therefore, in this article, an analytical method using approximation and aggregation procedures is introduced to evaluate the performance of flexible serial lines with Bernoulli machines and setups. Applying such a method, a long serial line is first decomposed into overlapped two-machine lines and then an iteration procedure is used backward and forward to estimate the line performance. Moreover, even in two-machine lines, the part sequence is approximated by the distribution of part types to reduce computation intensity. Using such a method, the system performance of long multiproduct Bernoulli lines with setups can be evaluated efficiently with an acceptable accuracy, which provides production engineers and managers an effective tool to study the transient performance of FMSs, and design real-time production control and improvement strategies.
引用
收藏
页码:135 / 150
页数:16
相关论文
共 50 条
  • [41] Transient analysis and real-time control of geometric serial lines with residence time constraints
    Wang, Feifan
    Ju, Feng
    Kang, Ningxuan
    IISE TRANSACTIONS, 2019, 51 (07) : 709 - 728
  • [42] Approximate Analysis of Reentrant Lines With Bernoulli Reliability Model
    Wang, Chong
    Li, Jingshan
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2010, 7 (03) : 708 - 715
  • [43] Formulation and Solution Methodology for Reducing Energy Consumption in Two-Machine Bernoulli Serial Lines
    Yan, Chao-Bo
    Cheng, Xingrui
    Gao, Feng
    Guan, Xiaohong
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2022, 19 (01) : 522 - 530
  • [44] Bernoulli serial lines with deteriorating product quality: performance evaluation and system-theoretic properties
    Naebulharam, Raed
    Zhang, Liang
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (05) : 1479 - 1494
  • [45] Iteration Algorithms for Performance Evaluation and Buffer Design of Bernoulli Serial Lines with Waiting Time Constraints
    Lee, Jun-Ho
    Li, Jingshan
    Horst, John A.
    2017 13TH IEEE CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2017, : 654 - 655
  • [46] Raw material release rates to ensure desired production lead time in Bernoulli serial lines
    Biller, Stephan
    Meerkov, Semyon M.
    Yan, Chao-Bo
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (14) : 4349 - 4364
  • [47] Real-Time Bottleneck in Serial Production Lines With Bernoulli Machines: Theory and Case Study
    Tu, Jiachen
    Bai, Yishu
    Yang, Mengzhuo
    Zhang, Liang
    Denno, Peter
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2021, 18 (04) : 1822 - 1834
  • [48] Detection and Correction of Buffer Occupancy Data Error in Two-Machine Bernoulli Serial Lines
    Zhu, Tianyu
    Zhang, Liang
    2022 IEEE 18TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2022, : 1854 - 1859
  • [49] Minimizing and balancing setups in a serial production system
    Detti, Paolo
    Meloni, Carlo
    Pranzo, Marco
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2007, 45 (24) : 5769 - 5788
  • [50] Energy Consumption Optimization in Two-Machine Bernoulli Serial Lines with Limits on Machine Efficiency
    Yan, Chao-Bo
    2019 IEEE 15TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2019, : 85 - 90