A multiprocessor task scheduling model for berth allocation: heuristic and worst-case analysis

被引:99
|
作者
Guan, YP
Xiao, WQ
Cheung, RK [1 ]
Li, CL
机构
[1] Hong Kong Univ Sci & Technol, Dept Ind Engn & Engn Management, Kowloon, Hong Kong, Peoples R China
[2] Georgia Inst Technol, Sch Ind & Syst Engn, Atlanta, GA 30332 USA
关键词
scheduling; sequencing; heuristic;
D O I
10.1016/S0167-6377(02)00147-5
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider a scheduling problem in which the processors are arranged along a straight line, and each job requires simultaneous processing by multiple consecutive processors. We assume that the job sizes and processing times are agreeable. Our objective is to minimize the total weighted completion time of the jobs. This problem is motivated by the operation of berth allocation, which is to allocate vessels (jobs) to a berth with multiple quay cranes (processors), where a vessel may be processed by multiple consecutive cranes simultaneously. We develop a heuristic for the problem and perform worst-case analysis. (C) 2002 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:343 / 350
页数:8