Role of Heritage Activism in Post-Disaster Reconstruction

被引:0
|
作者
Uprety, Sanjaya [1 ]
Shrestha, Barsha [1 ]
机构
[1] Tribhuvan Univ, Inst Engn, Dept Architecture, Lalitpur, Nepal
关键词
heritage activism; reconstruction; heritage value; event analysis; CULTURAL-HERITAGE; DISASTER;
D O I
暂无
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
In Nepal, heritage conservation is inherently political, as can be observed from the several heritage activisms in the various forms of protests, demonstrations, and criticisms of post-disaster reconstruction efforts of heritage structures of Kathmandu, which were heavily damaged by the Gorkha Earthquake of 2015. The politicization of heritage reconstruction is conspicuous in the government's approach to defining heritage objects and places for conservation, the methods by which it interprets the relics of the past, and the cultural history and the opposition it receives from local communities and civil society. This has led to the emergence of heritage activism to protect cultural heritage from the threat of loss. This paper aims at highlighting heritage activism and its role in the post-disaster context by discussing the politicization of the conservation agenda by the government (state actors) and activists (stakeholders). Specifically, it focuses the role of heritage activism using secondary sources of information to assess the heritage value, its significance, and the "event analysis method" to analyze the events of the protest against the government's reconstruction plan of Ranipokhari (Queen's Pond), located in the heart of the city of Kathmandu. The paper discusses the contributory factors for the emergence of heritage activism and its potential role in sensitizing state actors and stakeholders about the conservation agenda to safeguard conservation prerequisites. It concludes that heritage activism can serve as an important means of indirect public participation to influence the post-disaster conservation policies of heritage sites in developing countries like Nepal.
引用
收藏
页码:194 / 200
页数:7
相关论文
共 50 条
  • [31] Community Capacity Building and Post-disaster Psychosocial Reconstruction
    Chan, Cecilia L. W.
    Sun, Angie H. Y.
    Ho, Andy H. Y.
    Wang, X. L.
    Wang, X. Y.
    Zhang, Braven Q.
    Zhang, X. L.
    PROCEEDING OF INTERNATIONAL DISASTER AND RISK CONFERENCE CHENGDU 2009, 2009, : 69 - 73
  • [32] POST-DISASTER RECONSTRUCTION PLANNING - CASES OF NICARAGUA AND GUATEMALA
    KREIMER, A
    MASS EMERGENCIES, 1978, 3 (01): : 23 - 40
  • [33] Digital Architecture for Humanitarian Design in Post-Disaster Reconstruction
    Yeung, Wendy K.
    Harkins, Jeremy
    INTERNATIONAL JOURNAL OF ARCHITECTURAL COMPUTING, 2011, 9 (01) : 17 - 31
  • [34] Empowerment and legitimization of effected communities in post-disaster reconstruction
    Shafique, Kamran
    Warren, Clive M. J.
    7TH INTERNATIONAL CONFERENCE ON BUILDING RESILIENCE: USING SCIENTIFIC KNOWLEDGE TO INFORM POLICY AND PRACTICE IN DISASTER RISK REDUCTION, 2018, 212 : 1171 - 1178
  • [35] 'Building back better' is neoliberal post-disaster reconstruction
    Cheek, Wesley
    Chmutina, Ksenia
    DISASTERS, 2022, 46 (03) : 589 - 609
  • [36] Efficient Optimization of Post-Disaster Reconstruction of Transportation Networks
    El-Anwar, Omar
    Ye, Jin
    Orabi, Wallied
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2016, 30 (03)
  • [37] Building from scratch The aesthetics of post-disaster reconstruction
    Nygaard-Christensen, Maj
    ANTHROPOLOGY TODAY, 2011, 27 (06) : 8 - 10
  • [38] Post-disaster reconstruction of transportation infrastructures: Lessons learned
    Rouhanizadeh, Behzad
    Kermanshachi, Sharareh
    SUSTAINABLE CITIES AND SOCIETY, 2020, 63 (63)
  • [39] Research on Problems and Countermeasures of Post-Disaster Reconstruction in China
    Wang, Ling
    Fan, Zengyan
    Wang, Yan
    ICCREM 2015: ENVIRONMENT AND THE SUSTAINABLE BUILDING, 2015, : 491 - 496
  • [40] Post-Disaster Housing Reconstruction to Enable Resilient Communities
    Ahmed, Iftekhar
    Charlesworth, Esther
    OPEN HOUSE INTERNATIONAL, 2014, 39 (03) : 4 - 6