共 50 条
- [32] Secure and reliable standby for lignite-fired power plants: A model without any practical experience [J]. World of Mining - Surface and Underground, 2019, 71 (03): : 174 - 178
- [38] 600 MW EXTENSION TO LIGNITE-FIRED WEISWEILER POWER STATION [J]. BRENNSTOFF-WARME-KRAFT, 1971, 23 (05): : 200 - &
- [39] Economic implications of oxyfuel application in a lignite-fired power plant [J]. FUEL, 2007, 86 (14) : 2151 - 2158
- [40] Identification of Process Integration Options for CO2 Capture in Greek Lignite-Fired Power Plant [J]. PRES 2014, 17TH CONFERENCE ON PROCESS INTEGRATION, MODELLING AND OPTIMISATION FOR ENERGY SAVING AND POLLUTION REDUCTION, PTS 1-3, 2014, 39 : 1447 - +