共 50 条
- [25] Reliability analysis of the expected overtopping probability of rubble mound breakwater [J]. PROCEEDINGS OF THE THIRTEENTH (2003) INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL 4, 2003, : 493 - 496
- [29] Overtopping of the Rubble-Mound Breakwaters with the Curtain-Wall. [J]. 1972, 27 (05): : 409 - 419