Bi-stakeholder Conflict Resolution-Based Layout of Construction Temporary Facilities in Large-Scale Construction Projects

被引:7
|
作者
Song, Xiaoling [1 ,2 ]
Zhang, Zhe [1 ]
Xu, Jiuping [3 ]
Zeng, Ziqiang [4 ,5 ]
Shen, Charles [2 ]
Pea-Mora, Feniosky [2 ]
机构
[1] Nanjing Univ Sci & Technol, Dept Management Sci & Engn, Nanjing 210094, Jiangsu, Peoples R China
[2] Columbia Univ, Dept Civil Engn & Engn Mech, Adv ConsTruct & InfOrmat TechNol ACT Lab, New York, NY 10027 USA
[3] Sichuan Univ, State Key Lab Hydraul & Mt River Engn, Chengdu 610064, Sichuan, Peoples R China
[4] Sichuan Univ, Business Sch, Chengdu 610064, Sichuan, Peoples R China
[5] Univ Washington, Dept Civil & Environm Engn, Seattle, WA 98195 USA
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
Layout of CTFs; Material purchase; Layout planner; Stakeholder; Conflict resolution; GENETIC-ALGORITHMS; PROGRAMMING-MODEL; DECISION-MAKING; SYSTEM; OPTIMIZATION; SIZE;
D O I
10.1007/s40999-017-0233-4
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Planning a layout of construction temporary facilities (CTFs), a specific construction site layout problem, is crucial to the successful completion of large-scale construction projects. Despite considerable research undertaken, mutual relationships and conflicts between the layout planner and other pre-planning task stakeholders (i.e., for the scheduling of construction activities or the material purchase) are not yet addressed in the layout process. Resolving conflicts is crucial to the layout optimization and this study is among the first to plan appropriate CTF layouts by taking bi-stakeholder conflict resolution into account. A new bi-level mathematical method is developed based on the resolution of conflicts between the CTF layout planner and the material purchase stakeholder, and thus providing an example for future layouts with bi-stakeholder conflicts. In this method, a bi-level programming model is first established to model layout-related goals, constraints, and conflicts. Second, a bi-level genetic algorithm is proposed to solve the model for appropriate layouts. To demonstrate the applicability of the proposed method, the method is applied to design a CTF layout for the construction of a practical dam project. The results demonstrated that an appropriate layout and a satisfactory purchase plan were determined, and conflicts between the CTF layout and the material purchase were prevented. The contributions of the method are the ability to capture the mutual conflicts of the CTF layout and the material purchase in the bi-level model, the capacity to develop a more efficient and realistic layout, and the practicality to guide planners in other situations.
引用
收藏
页码:941 / 964
页数:24
相关论文
共 50 条
  • [21] Anti-corruption measures in large-scale construction projects
    Nezami, Pardis Nikoonam
    Shojaei, Payam
    Ebrahimi, Aboalghasem
    IMA JOURNAL OF MANAGEMENT MATHEMATICS, 2024, 35 (04) : 615 - 650
  • [22] Study of the characteristics of large-scale construction projects with the viewpoint of complexity
    Jiang Lin
    Qi Er-shi
    Du Bo
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7849 - 7852
  • [23] Developing a Hierarchical Road Layout Method for Large-Scale Construction Site
    Chen, Tian
    Hu, Hao
    Zhu, Fengfeng
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (09)
  • [24] VP-based safety management in large-scale construction projects: A conceptual framework
    Guo, H. L.
    Li, Heng
    Li, Vera
    AUTOMATION IN CONSTRUCTION, 2013, 34 : 16 - 24
  • [25] Construction of large-scale honeynet Based on Honeyd
    Wang, Jun
    Zeng, Jing
    CEIS 2011, 2011, 15
  • [26] Research on the Information Management System Design of Large-scale Construction Projects
    Liang, Jun
    Ding, Yunlong
    PROCEEDINGS OF 2012 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2012, : 439 - 445
  • [27] Parallel computing framework for optimizing construction planning in large-scale projects
    Kandil, A
    El-Rayes, K
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2005, 19 (03) : 304 - 312
  • [28] Underwater Bore Pile Foundations for Large-Scale Construction Projects.
    Bartholmai, Hans
    1600, (20):
  • [29] Fast and Accurate Risk Evaluation for Scheduling Large-Scale Construction Projects
    Jun, Dho Heon
    El-Rayes, Khaled
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2011, 25 (05) : 407 - 417
  • [30] Competition of large-scale projects: The game model of gas pipeline construction
    Brykalov, S. A.
    Melentsova, M. A.
    Nikonov, O. I.
    AUTOMATION AND REMOTE CONTROL, 2007, 68 (10) : 1745 - 1755