DDA analysis of the RCC modification for Pueblo dam

被引:0
|
作者
Kottenstette, JT [1 ]
机构
[1] US Bur Reclamat, Denver, CO 80225 USA
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Pueblo Dam is a massive head buttress structure founded on horizontally bedded sandstone and shale. Prominent shale beds beneath the structure daylight in the spillway stilling basin excavation downstream of the dam. Due to foundation sliding concerns the stilling basin has been filled with roller compacted concrete (RCC). The DDA model was used to check the stability of the modified structure assuming that no cohesion was available along the base of the RCC-plug/stilling basin lining contact. The DDA method is most effective when the structures are below the limit of equilibrium and movement has started, unfortunately at this point the structure is failing. This is not the case at Pueblo Dam.
引用
收藏
页码:127 / 132
页数:6
相关论文
共 50 条
  • [21] Seismic response of RCC dam including dam foundation interaction
    Thanoon, Huda A. M.
    Noorzaei, J.
    Jafaar, M.S.
    Thanoon, Waleed A.
    Malathy, R.
    Journal of Structural Engineering (India), 2013, 39 (06): : 620 - 627
  • [22] Technical solutions of bassara RCC dam
    Letica, Vicko
    Skoko, Vladislav
    Grubljesic, Ivana
    International Water Power and Dam Construction, 2010, 62 (05): : 29 - 32
  • [23] RECORD RCC DAM SET FOR COLOMBIA
    不详
    CIVIL ENGINEERING, 1990, 60 (05): : 27 - &
  • [24] First major RCC dam in Turkey
    Dodd, Andrew
    Spasic-Gril, Ljiljana
    International Water Power and Dam Construction, 2000, 52 (07): : 34 - 36
  • [25] Current RCC dam activity in the USA
    Hansen, K.D.
    International Journal on Hydropower and Dams, 1997, 4 (05): : 62 - 65
  • [26] Design of wan'an RCC overflow dam
    Chen, Chuanhui
    Ren Min Chang Jiang/Yangtze River, 1995, 26 (04):
  • [27] Stabilizing the spillway section foundation at Pueblo Dam
    Scott, GA
    Trojanowski, J
    H2GEO: GEOTECHNICAL ENGINEERING FOR WATER RESOURCES, 2005, (02): : 55 - 65
  • [28] Design of Zhouning RCC gravity dam
    Lin, L
    ROLLER COMPACTED CONCRETE DAMS, 2003, : 641 - 644
  • [29] LEAKAGE NO PROBLEM AT NEW RCC DAM
    不详
    HIGHWAY & HEAVY CONSTRUCTION, 1985, 128 (07): : 50 - 52
  • [30] RCC - A DAM REHAB SOLUTION UNEARTHED
    HANSEN, KD
    FRANCE, JW
    CIVIL ENGINEERING, 1986, 56 (09): : 60 - 63