A Study on Manufacturing Services Utilizing a Compact Production Set-up

被引:0
|
作者
Mishima, Nozomu [1 ]
机构
[1] Akita Univ, Grad Sch Engn & Resource Sci, Akita 010, Japan
关键词
microfactory; production set-up; manufacturing service; industrial product service systems; lifecycle phases;
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
The Microfactory developed by AIST is the origin of modern compact and distributed production set-up, which ensure a flexible combination of different manufacturing tasks. Since its introduction 13 years ago, various machine tools to satisfy the different tasks covered by the Microfactory have been developed. However, practical business ideas utilizing Microfactory features are insufficient. The paper first briefly describes the design of the Microfatory. Then, identifies relevant services considering it's flexible, on-site and safety properties. It can also enhance the energy and the resource efficiency of the manufacturing industries. In order to get ideas of manufacturing services, the paper analyzes the lifecycle phases of IPS2 with corresponding features. Finally, the paper concludes that manufacturing services featuring the Microfactory is one of the promising areas in future production.
引用
收藏
页码:634 / 639
页数:6
相关论文
共 50 条
  • [31] What a set-up!
    1600, PennWell Publ Co, Tulsa, OK, USA (18):
  • [32] DESIGN AND SCHEDULING FOR FLEXIBLE MANUFACTURING CELLS WITH AUTOMATIC SET-UP EQUIPMENT
    HITOMI, K
    YOSHIMURA, M
    OHASHI, K
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (07) : 1137 - 1147
  • [33] Automatic set-up
    Oakham, Martin
    Engineer, 2007, 293 (7730) : 38 - 40
  • [34] Experimental set-up
    Prace Naukowe Instytutu Technologii Budowy Maszyn Politechniki Wroclawskiej, 1991, 48 (13):
  • [35] Study of interfractional and intrafractional set-up errors in radiotherapy utilizing KV cone beam computed tomography
    Xu, F.
    Bai, S.
    Zhang, H.
    Wang, J.
    Gong, Y.
    Li, Y.
    Jiang, Q.
    INTERNATIONAL JOURNAL OF RADIATION ONCOLOGY BIOLOGY PHYSICS, 2007, 69 (03): : S695 - S695
  • [36] PRODUCTION ALLOCATION WITH SET-UP PENALTIES AND CONCAVE MATERIAL COSTS
    WHITE, CH
    OPERATIONS RESEARCH, 1969, 17 (06) : 958 - &
  • [37] Multiperiod production planning carrying over set-up time
    Porkka, PP
    Vepsäläinen, APJ
    Kuula, M
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2003, 41 (06) : 1133 - 1148
  • [38] Impact of the frequency of online verifications on the patient set-up accuracy and set-up margins
    Rudat, Volker
    Hammoud, Mohamed
    Pillay, Yogin
    Alaradi, Abdul Aziz
    Mohamed, Adel
    Altuwaijri, Saleh
    RADIATION ONCOLOGY, 2011, 6
  • [39] Adaptive set-up correction (ASC) to account for set-up errors in prostate radiotherapy
    Lauve, A
    Siebers, J
    Crimaldi, A
    Hagan, M
    Keall, P
    INTERNATIONAL JOURNAL OF RADIATION ONCOLOGY BIOLOGY PHYSICS, 2004, 60 (01): : S332 - S332
  • [40] Impact of the frequency of online verifications on the patient set-up accuracy and set-up margins
    Volker Rudat
    Mohamed Hammoud
    Yogin Pillay
    Abdul Aziz Alaradi
    Adel Mohamed
    Saleh Altuwaijri
    Radiation Oncology, 6