Fabrication of Be/CuCrZr/SS mock-ups for ITER first wall

被引:23
|
作者
Park, Jeong-Yong [1 ]
Choi, Byung-Kwon [1 ]
Lee, Jung-Suk [1 ]
Lee, Dong Won [2 ]
Hong, Bong Guen [2 ]
Jeong, Yong Hwan [1 ]
机构
[1] Korea Atom Energy Res Inst, Fus Technol Div, Taejon 305353, South Korea
[2] Korea Atom Energy Res Inst, Fus Engn Div, Taejon 305353, South Korea
关键词
ITER first wall; Be; CuCrZr; Stainless steel; Joining; HIP; BE/CU-ALLOY; HIP;
D O I
10.1016/j.fusengdes.2008.12.052
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
Three types of the mock-ups consisting of Be, CuCrZr and stainless steel (SS) were fabricated by a HIP joining method to demonstrate the fabricability of the ITER first wall. The effects of the mock-up design and the interlayer type on the joining strength of the Be/CuCrZr joint were investigated on the basis of the shear test results for the Be/CuCrZr joint specimens. The joining strength of the Be/CuCrZr ranged from 78 MPa to 204 MPa depending on the types of mock-ups and interlayers. The highest shear strength was obtained from the Be/CuCrZr joint specimens which were taken from the Be/CuCrZr/SS mock-ups with three 80 mm x 80 mm x 10 mm Be tiles and a Cr/Cu interlayer. The effect of the size and the number of Be tiles used in the mock-ups was not as significant as the interlayer selection. Even though the shear test is considered to be very useful to elucidate which interlayer is the most applicable for the joining of Be and CuCrZr, the final interlayer selection should be based on the results obtained from the high heat flux test for the mock-ups fabricated in this work. (C) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:1468 / 1471
页数:4
相关论文
共 50 条
  • [31] High heat flux testing of mock-ups for a full tungsten ITER divertor
    Gavila, P.
    Riccardi, B.
    Constans, S.
    Jouvelot, J. L.
    Vastra, I. Bobin
    Missirlian, M.
    Richou, M.
    FUSION ENGINEERING AND DESIGN, 2011, 86 (9-11) : 1652 - 1655
  • [32] Visualizing digital mock-ups
    Deitz, D
    MECHANICAL ENGINEERING, 1995, 117 (10) : 22 - 22
  • [33] In-pile testing of ITER first wall mock-ups at relevant thermal loading conditions in the LVR-15 nuclear research reactor
    Kysela, Jan
    Entler, Slavomir
    Vsolak, Rudolf
    Klabik, Tomas
    Zlamal, Ondrej
    Bellin, Boris
    Zacchia, Francesco
    FUSION ENGINEERING AND DESIGN, 2015, 98-99 : 1271 - 1275
  • [34] Neutron irradiation effects on the low cycle thermal fatigue performance of first wall mock-ups
    Dorow-Gerspach, D.
    Loewenhoff, Th.
    Pintsuk, G.
    Wirtz, M.
    NUCLEAR MATERIALS AND ENERGY, 2024, 38
  • [35] MOCK-UPS FOR DESIGN STUDIES
    BALMER, T
    DESIGN NEWS, 1973, 28 (06) : 66 - 67
  • [36] Fabrication and high heat flux test of the first wall mock-ups for the Korean He Cooled Test Blanket (KO HCML TBM)
    Lee, Dong Won
    Kim, Suk Kwon
    Bae, Young Dug
    Chang, Doo Hee
    Hong, Bong Guen
    FUSION ENGINEERING AND DESIGN, 2009, 84 (7-11) : 1164 - 1169
  • [37] High heat flux testing of EU tungsten monoblock mock-ups for the ITER divertor
    Gavila, P.
    Riccardi, B.
    Pintsuk, G.
    Ritz, G.
    Kuznetsov, V.
    Durocher, A.
    FUSION ENGINEERING AND DESIGN, 2015, 98-99 : 1305 - 1309
  • [38] Mock-Ups as "Interactive Laboratories": Mixed Methods Research Using Inpatient Unit Room Mock-Ups
    Watkins, Nicholas
    Myers, Donald
    Villasante, Ronald
    HERD-HEALTH ENVIRONMENTS RESEARCH & DESIGN JOURNAL, 2008, 2 (01) : 66 - 81
  • [39] Method design, manufacture and tests of the porous beryllium mock-ups for the ITER breeding blanket
    Davydov, D.A.
    Solonin, M.I.
    Markuchkin, Yu.E.
    Gorokhov, V.A.
    Gorlevsky, V.V.
    Journal of Nuclear Materials, 1999, 271-272 : 435 - 439
  • [40] Experimental investigation of tritium effect on cryosorption panel mock-ups for ITER vacuum pumps
    Russian Federal Nuclear Cent, Sarov, Russia
    Fusion Eng Des, Pt A (971-976):