An Estimation of Distribution Algorithm for Solving the Quay Crane Scheduling Problem with Availability Constraints

被引:3
|
作者
Exposito Izquierdo, Christopher [1 ]
Melian Batista, Belen [1 ]
Marcos Moreno Vega, J. [1 ]
机构
[1] Univ La Laguna, ETS Ingn Informat, Dpto Estadist IO & Computac, E-38207 San Cristobal la Laguna, Spain
关键词
Evolutionary Computing; Quay Crane Scheduling Problem; Container Terminal; Unidirectional Schedule;
D O I
10.3233/978-1-61499-105-2-10
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This work addresses the Quay Crane Scheduling Problem under availability constraints, whose main goal is to determine the work schedules of the quay cranes allocated to a container vessel in order to carry out its transhipment operations (loading and unloading operations). An Estimation of Distribution Algorithm with shaking procedure is proposed to solve it. The position of the tasks and the operative areas of quay cranes are considered in the initialization step in order to reach high-quality regions of the search space. Computational experiments show that this method improves previous state-of-art approaches.
引用
收藏
页码:10 / 19
页数:10
相关论文
共 50 条
  • [31] Quay Crane Scheduling Problem with the Consideration of Maintenance
    Liu, Ming
    Liang, Bian
    Zheng, Feifeng
    Chu, Chengbin
    Chu, Feng
    2018 IEEE 15TH INTERNATIONAL CONFERENCE ON NETWORKING, SENSING AND CONTROL (ICNSC), 2018,
  • [32] Solving the 3D stowage planning problem integrated with the quay crane scheduling problem by representation by rules and genetic algorithm
    Azevedo, Anibal Tavares
    de Salles Neto, Luiz Leduino
    Chaves, Antonio Augusto
    Moretti, Antonio Carlos
    APPLIED SOFT COMPUTING, 2018, 65 : 495 - 516
  • [33] Modeling and solving rich quay crane scheduling problems
    Legato, Pasquale
    Trunfio, Roberto
    Meisel, Frank
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (09) : 2063 - 2078
  • [34] An Efficient Heuristic Algorithm for Solving Crane Scheduling Problem
    Xie, Xie
    Li, Yanping
    Zheng, Yongyue
    Li, Xiaoli
    MATERIALS ENGINEERING AND MECHANICAL AUTOMATION, 2014, 442 : 443 - +
  • [35] A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal
    Moccia, L
    Cordeau, JF
    Gaudioso, M
    Laporte, G
    NAVAL RESEARCH LOGISTICS, 2006, 53 (01) : 45 - 59
  • [36] A fast heuristic for quay crane scheduling with interference constraints
    Bierwirth, Christian
    Meisel, Frank
    JOURNAL OF SCHEDULING, 2009, 12 (04) : 345 - 360
  • [37] A fast heuristic for quay crane scheduling with interference constraints
    Christian Bierwirth
    Frank Meisel
    Journal of Scheduling, 2009, 12 : 345 - 360
  • [38] A particle swarm optimization for the quay crane scheduling problem with non-interference constraints
    Zhao, Jiao
    Tang, Lixin
    2009 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS ( ICAL 2009), VOLS 1-3, 2009, : 270 - 272
  • [39] Addressing a Coordinated Quay Crane Scheduling and Assignment Problem by Red Deer Algorithm
    Fazli, M.
    Fathollahi-Fard, A. M.
    Tian, G.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2019, 32 (08): : 1186 - 1191
  • [40] A tabu search heuristic for the quay crane scheduling problem
    Sammarra, Marcello
    Cordeau, Jean-Francois
    Laporte, Gilbert
    Monaco, M. Flavia
    JOURNAL OF SCHEDULING, 2007, 10 (4-5) : 327 - 336