A variable neighbourhood search for hybrid flow-shop scheduling problem with rework and set-up times

被引:21
|
作者
Eskandari, Hamidreza [1 ]
Hosseinzadeh, Amirhamed [1 ]
机构
[1] Tarbiat Modares Univ, Tehran 14115111, Iran
关键词
hybrid flow-shop; rework; mathematical formulation; heuristics; variable neighbourhood search; MINIMIZING MAKESPAN; SHOP; ALGORITHMS;
D O I
10.1057/jors.2013.70
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper deals with hybrid flow-shop scheduling problem with rework. In this problem, jobs are inspected at the last stage, and poorly processed jobs were returned and processed again. Thus, a job may visit a stage more than once, and we have a hybrid flow-shop with re-entrant flow. This kind of a shop may occur in many industries, such as final inspection system in automotive manufacturing. The criterion is to minimize the makespan of the system. We developed a 0-1 mixed-integer program of the problem. Since the hybrid flow-shop scheduling problem is NP-hard, an algorithm for finding an optimal solution in polynomial time does not exist. So we generalized some heuristic methods based on several basic dispatching rules and proposed a variable neighbourhood search (VNS) for the problem with sequence-dependent set-up times and unrelated parallel machines. The computational experiments show that VNS provides better solutions than heuristic methods.
引用
收藏
页码:1221 / 1231
页数:11
相关论文
共 50 条
  • [21] Dynamic set-up rules for hybrid flow shop scheduling with parallel batching machines
    Rossi, Andrea
    Pandolfi, Andrea
    Lanzetta, Michele
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (13) : 3842 - 3857
  • [22] Hybrid Flow-shop Scheduling Problem Based on Saving Energy
    Liu Xiang
    Zou Fengxing
    Zhang Xiangping
    Gao Zheng
    PROCEEDINGS OF THE 27TH CHINESE CONTROL CONFERENCE, VOL 7, 2008, : 48 - 53
  • [23] A Distributed Approach to Solving Hybrid Flow-shop Scheduling Problem
    Zou Feng-xing
    Zeng Ling-li
    Gao Zheng
    Liu Feng
    CCDC 2009: 21ST CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, PROCEEDINGS, 2009, : 2457 - 2461
  • [24] Solving permutation flow-shop scheduling problem by rhinoceros search algorithm
    Deb, Suash
    Tian, Zhonghuan
    Fong, Simon
    Tang, Rui
    Wong, Raymond
    Dey, Nilanjan
    SOFT COMPUTING, 2018, 22 (18) : 6025 - 6034
  • [25] Solving permutation flow-shop scheduling problem by rhinoceros search algorithm
    Suash Deb
    Zhonghuan Tian
    Simon Fong
    Rui Tang
    Raymond Wong
    Nilanjan Dey
    Soft Computing, 2018, 22 : 6025 - 6034
  • [26] Hybrid Flow Shop with Setup Times Scheduling Problem
    Jemmali, Mahdi
    Hidri, Lotfi
    COMPUTER SYSTEMS SCIENCE AND ENGINEERING, 2023, 44 (01): : 563 - 577
  • [27] A Heuristic Search Algorithm for Flow-Shop Scheduling
    Fan, Joshua Poh-Onn
    Winley, Graham K.
    INFORMATICA-JOURNAL OF COMPUTING AND INFORMATICS, 2008, 32 (04): : 453 - 464
  • [28] DISCRETE HARMONY SEARCH FOR FLOW-SHOP SCHEDULING
    Wu, Jian
    Zhou, Hong
    ICIM2012: PROCEEDINGS OF THE ELEVENTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2012, : 125 - 128
  • [29] An Ant Colony System Algorithm for the Hybrid Flow-Shop Scheduling Problem
    Khalouli, Safa
    Ghedjati, Fatima
    Hamzaoui, Abdelaziz
    INTERNATIONAL JOURNAL OF APPLIED METAHEURISTIC COMPUTING, 2011, 2 (01) : 29 - 43
  • [30] Immune Clonal Selection Algorithm for Hybrid Flow-shop Scheduling Problem
    Liu, Feng
    Zhang, Xiang-ping
    Zou, Feng-xing
    Zeng, Ling-li
    CCDC 2009: 21ST CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, PROCEEDINGS, 2009, : 2605 - 2609