Improving Design Performance by Alliance between Contractors and Designers in International Hydropower EPC Projects from the Perspective of Chinese Construction Companies

被引:15
|
作者
Zhang, Qingzhen [1 ]
Tang, Wenzhe [1 ]
Liu, Jersey [1 ]
Duffiel, Colin F. [2 ]
Hui, Felix Kin Peng [2 ]
Zhang, Lihai [2 ]
Zhang, Xuteng [1 ]
机构
[1] Tsinghua Univ, State Key Lab Hydrosci & Engn, Dept Hydraul Engn, Beijing 100084, Peoples R China
[2] Univ Melbourne, Dept Infrastruct Engn, Melbourne, Vic 3010, Australia
基金
中国国家自然科学基金;
关键词
hydropower; project management; engineering-procurement-construction; design management; design performance; RELATIONAL GOVERNANCE; CONCEPTUAL-MODEL; MANAGEMENT; SUCCESS; IMPACT; PROCUREMENT; AUSTRALIA; TRENDS;
D O I
10.3390/su10041171
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Extant literature lacks a systematic framework addressing the mechanisms of the alliance functional process and its impacts on management activities together with performance in delivering Engineering-procurement-construction (EPC) projects. This study quantitatively investigates the cause-effect relationships among these themes by building and validating a conceptual model of contractor-designer alliance in international hydropower EPC projects. With the support of data collected from an industry survey, the results reveal the key design problems, application of contractor-designer alliance, design management level and performance, which form a sound basis for design management emphasis in EPC activities, e.g., sufficiently considering sustainability of hydropower projects by incorporating environmental, social, and economic factors into designs. The path analysis indicates that the contractor-designer alliance can not only improve design performance by enhancing design management, but also directly promote design performance. This research has significant contributions to the body of knowledge by building interdisciplinary linkages between the areas of alliance, design management, and performance, theoretically demonstrating the mechanism of how interfirm cooperation functions to achieve superior design outcomes of hydropower EPC projects. Understanding these causal relationships will be crucial for contractors and designers to optimally allocate their complementary resources for seeking better design solutions in dealing with both technical issues and sustainability factors.
引用
收藏
页数:24
相关论文
共 16 条
  • [1] Enhancing Design Management by Partnering in Delivery of International EPC Projects: Evidence from Chinese Construction Companies
    Wang, Tengfei
    Tang, Wenzhe
    Qi, Dashan
    Shen, Wenxin
    Huang, Min
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (04)
  • [2] Enhancing Risk Management by Partnering in International EPC Projects: Perspective from Evolutionary Game in Chinese Construction Companies
    Yang, Yujing
    Tang, Wenzhe
    Shen, Wenxin
    Wang, Tengfei
    SUSTAINABILITY, 2019, 11 (19)
  • [3] HOW TO GET INTERNATIONAL CONSTRUCTION PROJECTS DELIVERED ON TIME: FROM CHINESE CONTRACTORS' PERSPECTIVE
    Sun, Hongxin
    Tang, Wenzhe
    Duffield, Colin F.
    Zhang, Lihai
    Hui, Felix Kin Peng
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2022, 28 (02) : 134 - 149
  • [4] Forming Mechanism of Political Risks in International Construction Projects: From the Perspective of Chinese Contractors
    Ullah, Safi
    Deng, Xiaopeng
    Chang, Tengyuan
    FRONTIERS IN BUILT ENVIRONMENT, 2019, 5
  • [5] Research on Grading of Risk Factors in International EPC Projects from Contractors' Perspective
    Li, Jiqin
    Yang, Yong
    Zheng, Yu
    Li, Xiaodong
    CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE II, PTS 1 AND 2, 2013, 438-439 : 1968 - +
  • [6] Identification of critical risks in international engineering procurement construction projects of Chinese contractors from the network perspective
    Ganbat, Tsenguun
    Chong, Heap-yih
    Liao, Pin-Chao
    Leroy, Jeremy
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2020, 47 (12) : 1359 - 1371
  • [7] Risk Paths in International Construction Projects: Case Study from Chinese Contractors
    Liu, Junying
    Zhao, Xianbo
    Yan, Peng
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (06)
  • [8] Improving Quantitative Assessment of Political Risk in International Construction Projects: The Case of Chinese Construction Companies
    Chang, Tengyuan
    Deng, Xiaopeng
    Hwang, Bon-Gang
    Zhao, Xiaojing
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (12)
  • [9] The Influence of Cultural Intelligence and Institutional Distance of Chinese and Korean Contractors on the Performance of International Construction Projects
    Yi-Hsin Lin
    Huijin Zhang
    Chan Joong Kim
    Zhao Xu
    Shuangshuang Xu
    KSCE Journal of Civil Engineering, 2021, 25 : 3223 - 3234
  • [10] The Influence of Cultural Intelligence and Institutional Distance of Chinese and Korean Contractors on the Performance of International Construction Projects
    Lin, Yi-Hsin
    Zhang, Huijin
    Kim, Chan Joong
    Xu, Zhao
    Xu, Shuangshuang
    KSCE JOURNAL OF CIVIL ENGINEERING, 2021, 25 (09) : 3223 - 3234