Understanding supplier motivation to engage in multiparty performance-based contracts: The lens of Expectancy theory

被引:13
|
作者
Nikulina, Anna [1 ]
Wynstra, Finn [1 ]
机构
[1] Erasmus Univ, Rotterdam Sch Management, Burgemeester Oudlaan 50, NL-3062 PA Rotterdam, Netherlands
关键词
Multiparty contract; Outcome uncertainty; Outcome attributability; Performance-based contract; Reciprocal interdependence; Supplier motivation; AGENCY THEORY; INCENTIVE MECHANISMS; GOVERNANCE; PROJECTS; PERSPECTIVE; INTEGRATION; SERVICES; BEHAVIOR; CHAINS; NORMS;
D O I
10.1016/j.pursup.2022.100746
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Research on performance-based contracts (PBCs) has emphasized outcome uncertainty (lack of outcome attributability) as an obstacle to applying such contracts effectively and has investigated possible ways to mitigate this uncertainty. Most studies primarily address dyadic buyer-supplier contracts and the uncertainty that originates in the environment or in buyer behaviour. However, suppliers often also depend on other sup-pliers and sub-suppliers in the process of outcome creation. Such reciprocal interdependencies between more than two parties cannot easily be addressed through dyadic contracts. This paper examines how effective multiparty PBCs can be designed to align the interests of multiple suppliers. To develop our a priori con-ceptualisation, we first review the literature and identify the factors that affect suppliers' willingness to engage in PBCs, drawing on Expectancy theory to unravel the motivational effects of rewards. We then use case studies from the construction sector to investigate how these factors apply to multiparty PBCs and identify specific variables that influence supplier motivation in such settings. Based on our findings, we propose that expectancy (the relationship between effort and performance) is enhanced by parties' joint participation in the planning and control of project activities, their reputation, and specific contractual elements such as the codification of collaboration or reward design in hybrid PBCs. Instrumentality (the link between performance and reward) is primarily affected by the perceived fairness of the reward sharing and codified collaboration, and valence (the relationship between reward and supplier objectives) is mainly influenced by the monetary amounts at stake.
引用
收藏
页数:15
相关论文
共 50 条
  • [41] International process plant contracts for use on other performance-based projects
    Buckingham, Paul
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2007, 25 (07) : 709 - 713
  • [42] Adverse Selection and Moral Hazard in Infrastructure Performance-Based Maintenance Contracts
    Lei, Shi
    2012 FIFTH INTERNATIONAL CONFERENCE ON BUSINESS INTELLIGENCE AND FINANCIAL ENGINEERING (BIFE), 2012, : 561 - 566
  • [43] Valuation of performance-based contracts for capital equipment: A stochastic programming approach
    Sharifi, Mohammadreza
    Kwon, Roy H.
    Jardine, Andrew K. S.
    ENGINEERING ECONOMIST, 2016, 61 (01): : 1 - 22
  • [44] Optimal Maintenance and Rehabilitation Policies for Performance-Based Road Maintenance Contracts
    Abu Samra, Soliman
    Osman, Hesham
    Hosny, Ossama
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2017, 31 (01)
  • [45] Performance-based ship management contracts using the Shipping KPI standard
    Rialland A.
    Nesheim D.A.
    Norbeck J.A.
    Rødseth Ø.J.
    WMU Journal of Maritime Affairs, 2014, 13 (2) : 191 - 206
  • [46] Using situated expectancy value theory to explore initial teacher education students' motivation to engage with challenging mathematical tasks
    Fielding, Jill
    Geiger, Vincent
    Miller, Jodie
    Bruder, Regina
    Towara, Ulrike
    Ratnayake, Iresha
    TEACHING AND TEACHER EDUCATION, 2022, 113
  • [47] Using situated expectancy value theory to explore initial teacher education students' motivation to engage with challenging mathematical tasks
    Fielding, Jill
    Geiger, Vincent
    Miller, Jodie
    Bruder, Regina
    Towara, Ulrike
    Ratnayake, Iresha
    TEACHING AND TEACHER EDUCATION, 2022, 113
  • [49] Motivation, performance, and job satisfaction of construction management professionals - An expectancy theory research approach
    Zhou, Yangbo
    Jergeas, George
    Ruwanpura, Janaka
    PROCEEDINGS OF IRNOP VII PROJECT RESEARCH CONFERENCE, 2006, : 239 - +
  • [50] GROUP MOTIVATION AND GROUP TASK-PERFORMANCE - THE EXPECTANCY-VALENCE THEORY APPROACH
    NAKANISHI, M
    SMALL GROUP BEHAVIOR, 1988, 19 (01): : 35 - 55