Quality issues in lean production implementation:: a case study of a French automotive supplier

被引:17
|
作者
Söderquist, K
Motwani, J
机构
[1] Grp ESC Grenoble, Grad Sch Business, F-38003 Grenoble 01, France
[2] Grand Valley State Univ, Seidman Sch Business, Dept Management, Allendale, MI 49504 USA
来源
TOTAL QUALITY MANAGEMENT | 1999年 / 10卷 / 08期
关键词
D O I
10.1080/0954412997091
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Among the major changes related to the emergence of lean production that the European automotive component sector has undergone over the last 5 years, new approaches to quality management is one of the most significant. However, there is very little literature, in terms of case studies Or examples, that focuses on the daily struggle in companies of transforming these strategies into working practice. The research reported in this paper illustrates, by means of a case study, how a French automotive supplier has confronted the challenge and adopted quality management-related concepts of lean production in its operation. Lean quality management is analysed in six domains: top management support-leadership policy, customer relationships, product design process, process flow management, continuous improvement and market outcomes. It is concluded that if quality is managed in an integrated way where management support and customer relationships condition the operations context, quality management can become a resource enabling suppliers to create distinctive competitive advantage and thus achieve positive market outcomes.
引用
收藏
页码:1107 / 1122
页数:16
相关论文
共 50 条
  • [31] Implementation of Lean Six Sigma framework with environmental considerations in an Indian automotive component manufacturing firm: a case study
    Ben Ruben, R.
    Vinodh, S.
    Asokan, P.
    PRODUCTION PLANNING & CONTROL, 2017, 28 (15) : 1193 - 1211
  • [32] A Case Study On Deployment of Technology Combined Lean Implementation Framework in Automotive Sector through a Systematic Planning Scheme
    Rafique, Muhammad Zeeshan
    Ab Rahman, Mohd Nizam
    Leuveano, Raden Achmad Chairdino
    Saibani, Nizaroyani
    Arsad, Norhana
    PROCEEDINGS OF INTERNATIONAL CONFERENCE ON ADVANCED PROCESSES AND SYSTEMS IN MANUFACTURING (APSIM 2016), 2016, : 69 - 70
  • [33] Lean Manufacturing Practices Assessment Case Study of Automotive Company
    Habek, Patrycja
    Lavios, Juan J.
    Grzywa, Adam
    PRODUCTION ENGINEERING ARCHIVES, 2023, 29 (03) : 311 - 318
  • [34] Implementing lean information management: the case study of an automotive company
    Bevilacqua, Maurizio
    Ciarapica, Filippo Emanuele
    Paciarotti, Claudia
    PRODUCTION PLANNING & CONTROL, 2015, 26 (10) : 753 - 768
  • [35] Lean Manager in the Factory of the Future Case study in automotive industry
    Rother, Eva
    Baboli, Armand
    2019 IEEE 6TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND APPLICATIONS (ICIEA), 2019, : 218 - 224
  • [36] Potential alternative for water and energy savings in the automotive industry: case study for an Austrian automotive supplier
    Enderle, Peter
    Nowak, Otto
    Kvas, Julia
    JOURNAL OF CLEANER PRODUCTION, 2012, 34 : 146 - 152
  • [37] A resilient global supplier selection strategy—a case study of an automotive company
    Amy Chen
    Chih-Ying Hsieh
    H. M. Wee
    The International Journal of Advanced Manufacturing Technology, 2016, 87 : 1475 - 1490
  • [38] Intercompany performance benchmarking in maintenance - a case study in the global screen-printing production network of an automotive supplier
    Stemplinger, Christian T.
    Winkler, Herwig
    ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, 2015, 110 (03): : 130 - 133
  • [39] A resilient global supplier selection strategy—a case study of an automotive company
    Hsieh, Chih-Ying (cishieh@vnu.edu.tw), 1600, Springer London (87): : 5 - 8
  • [40] Issues of rigor and feasibility when observing the quality of program implementation: A case study
    Brandon, Paul R.
    Lawton, Brian E.
    Harrison, George M.
    EVALUATION AND PROGRAM PLANNING, 2014, 44 : 75 - 80