Automated planning of process models: Design of a novel approach to construct exclusive choices

被引:14
|
作者
Heinrich, Bernd [1 ]
Klier, Mathias [1 ]
Zimmermann, Steffen [2 ]
机构
[1] Univ Regensburg, Dept Management Informat Syst, D-93040 Regensburg, Germany
[2] Univ Innsbruck, Dept Informat Syst Prod & Logist Management, A-6020 Innsbruck, Austria
基金
奥地利科学基金会;
关键词
Process model; Automated planning; Exclusive choice; Algorithm; Design science research; BUSINESS PROCESS MANAGEMENT; WEB SERVICES COMPOSITION; SCIENCE;
D O I
10.1016/j.dss.2015.07.005
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In times of dynamically changing markets, companies are forced to (re)design their processes quickly and frequently, which typically implies a significant degree of time-consuming and cost-intensive manual work. To alleviate this drawback, we envision the automated planning of process models. More precisely, we propose a novel algorithm for an automated construction of the control flow pattern 'exclusive choice', which constitutes an essential step toward an automated planning of process models. The algorithm is built upon an abstract representation language that provides a general and formal basis and serves as the vocabulary to define the planning problem. As part of our evaluation, we find that, based on a given planning problem, our algorithm is not subject to potential modeling failures. We further implement the approach in process planning software and analyze not only its feasibility and applicability by means of several real-world processes from different application contexts and companies but also its practical utility based on the criteria flexibility by definition, modeling costs, and modeling time. (C) 2015 Elsevier B.V. All rights reserved.
引用
收藏
页码:1 / 14
页数:14
相关论文
共 50 条
  • [21] Automated Process Planning for Turning: A Feature-Free Approach
    Behandish, Morad
    Nelaturi, Saigopal
    Allard, Mats
    ADVANCES IN MANUFACTURING TECHNOLOGY XXXII, 2018, 8 : 45 - 50
  • [22] SEMPA - A Semantic Business Process Management Approach for the Planning of Process Models
    Heinrich, Bernd
    Bewernik, Marc-Andre
    Henneberger, Matthias
    Krammer, Alexander
    Lautenbacher, Florian
    WIRTSCHAFTSINFORMATIK, 2008, 50 (06): : 445 - 460
  • [23] DESIGN AND IMPLEMENTATION OF A RELATIONAL DATA-BASE FOR AUTOMATED PROCESS PLANNING
    SHOOSHTARIAN, FD
    CHANG, DJ
    DONG, JJ
    PARSAEI, HR
    COMPUTERS & INDUSTRIAL ENGINEERING, 1993, 25 (1-4) : 309 - 312
  • [24] NOVEL OPTIMIZATION APPROACH OF STOCHASTIC PLANNING-MODELS
    IERAPETRITOU, MG
    PISTIKOPOULOS, EN
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1994, 33 (08) : 1930 - 1942
  • [25] Simultaneous engineering approach to an integrated design and process planning
    Eversheim, W
    Bochtler, W
    Grassler, R
    Kolscheid, W
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 100 (02) : 327 - 337
  • [26] A novel concurrent design process planning method and application
    Pan, Zhiyi
    Li, Yingguang
    Huang, Xiang
    PROCEEDINGS OF THE 2008 12TH INTERNATIONAL CONFERENCE ON COMPUTER SUPPORTED COOPERATIVE WORK IN DESIGN, VOLS I AND II, 2008, : 835 - 840
  • [27] Configuring Configurable Process Models Made Easier: An Automated Approach
    Schunselaar, D. M. M.
    Leopold, Henrik
    Verbeek, H. M. W.
    van der Aalst, Wil M. P.
    Reijers, Hajo A.
    BUSINESS PROCESS MANAGEMENT WORKSHOPS( BPM 2014), 2015, 202 : 105 - 117
  • [28] Simultaneous engineering approach to an integrated design and process planning
    Aachen Univ of Technology, Aachen, Germany
    Eur J Oper Res, 2 (327-337):
  • [29] A Novel Approach to Process Mining : Intentional Process Models Discovery
    Khodabandelou, Ghazaleh
    Hug, Charlotte
    Salinesi, Camille
    2014 IEEE EIGHTH INTERNATIONAL CONFERENCE ON RESEARCH CHALLENGES IN INFORMATION SCIENCE (RCIS), 2014,
  • [30] Automated process planning system: A new method for setup planning and a mathematical model for fixture design
    Abedini, Vahid
    Shakeri, Mohsen
    Siahmargouei, Mohammad Hasan
    Baseri, Hamid
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2013, 227 (12) : 1849 - 1859