On the complexity of constructing a minmax regret solution for the two-machine flow shop problem under the interval uncertainty

被引:1
|
作者
Shafransky, Yakov [1 ]
Shinkarevich, Viktor [2 ]
机构
[1] NAS Belarus, United Inst Informat Problems, Minsk, BELARUS
[2] Belarusian State Univ, Minsk, BELARUS
关键词
Minmax regret; Interval uncertainty; Two-machine flow shop; NP-hardness;
D O I
10.1007/s10951-020-00663-6
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We prove the NP-hardness of constructing a minmax regret solution for the two-machine flow shop problem under the interval uncertainty of the job processing times. The problem complexity status has been an open question for over the past 20 years. We establish the NP-hardness of this problem using a so-called alternative scheme for proving the NP-hardness of optimization problems. Also, we show that the problem is non-approximable in polynomial time.
引用
收藏
页码:745 / 749
页数:5
相关论文
共 50 条
  • [1] On the complexity of constructing a minmax regret solution for the two-machine flow shop problem under the interval uncertainty
    Yakov Shafransky
    Viktor Shinkarevich
    Journal of Scheduling, 2020, 23 : 745 - 749
  • [2] The dominance digraph as a solution to the two-machine flow-shop problem with interval processing times
    Matsveichuk, N. M.
    Sotskov, Y. N.
    Werner, F.
    OPTIMIZATION, 2011, 60 (12) : 1493 - 1517
  • [3] The minmax regret permutation flow-shop problem with two jobs
    Averbakh, I
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 169 (03) : 761 - 766
  • [4] Exact solution of the two-machine flow shop problem with three operations
    Della Croce F.
    Salassa F.
    T'kindt V.
    Computers and Operations Research, 2022, 138
  • [5] Heuristic algorithms for the minmax regret flow-shop problem with interval processing times
    Michał Ćwik
    Jerzy Józefczyk
    Central European Journal of Operations Research, 2018, 26 : 215 - 238
  • [6] Heuristic algorithms for the minmax regret flow-shop problem with interval processing times
    Cwik, Michal
    Jozefczyk, Jerzy
    CENTRAL EUROPEAN JOURNAL OF OPERATIONS RESEARCH, 2018, 26 (01) : 215 - 238
  • [7] Approximating a two-machine flow shop scheduling under discrete scenario uncertainty
    Kasperski, Adam
    Kurpisz, Adam
    Zielinski, Pawel
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 217 (01) : 36 - 43
  • [8] Combinatorial two-stage minmax regret problems under interval uncertainty
    Marc Goerigk
    Adam Kasperski
    Paweł Zieliński
    Annals of Operations Research, 2021, 300 : 23 - 50
  • [9] Combinatorial two-stage minmax regret problems under interval uncertainty
    Goerigkl, Marc
    Kasperski, Adam
    Zielinski, Pawel
    ANNALS OF OPERATIONS RESEARCH, 2021, 300 (01) : 23 - 50
  • [10] The two-machine flow shop problem with conflict graphs
    Tellache, Nour El Houda
    Boudhar, Mourad
    IFAC PAPERSONLINE, 2016, 49 (12): : 1026 - 1031