Solution of fuzzy multi-objective project crashing problem

被引:7
|
作者
Gocken, Tolunay [1 ]
机构
[1] Gaziantep Univ, Dept Ind Engn, Gaziantep, Turkey
来源
NEURAL COMPUTING & APPLICATIONS | 2013年 / 23卷 / 7-8期
关键词
Project crashing problem; Fuzzy mathematical programming; Fuzzy ranking; Tabu search; RANKING; SEARCH; OPTIMIZATION; SETS;
D O I
10.1007/s00521-012-1167-z
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Project management is a very important field employed for scheduling activities and monitoring the progress, in competitive and fluctuating environments. The feasible duration time required to perform a specific project is determined using critical path method. However, because of competitive priorities, time is important and the completion time of a project determined using critical path method should be reduced to meet a deadline requested. In this situation, project crashing problem arises. Project crashing analysis is concerned with shortening the project duration time by accelerating some of its activities at an additional cost. In general, the parameters of the problem are accepted as certain and the project crashing problems are solved using deterministic solution techniques. In reality, because of uncertain environment conditions, incomplete or unobtainable information, there can be ambiguity in the parameters of the problem. The uncertainty in the parameters can be modeled via fuzzy set theory. Using fuzzy models gives the chance of better project management decisions with more stability under uncertain environmental factors. In the literature, various authors solved different fuzzy versions of project management problems via transforming them into their crisp equivalents. In this study, a fuzzy multi-objective project crashing problem with fuzzy parameters is handled. The fuzzy project crashing problem is solved with a direct solution approach based on fuzzy ranking methods and the tabu search algorithm.
引用
收藏
页码:2167 / 2175
页数:9
相关论文
共 50 条
  • [31] A MULTI-OBJECTIVE FUZZY DYNAMIC PROGRAMMING METHOD FOR PROJECT INVESTMENT
    Kang, Haigui
    Liu, Yan
    Zheng, Yuanxun
    Sun, Min
    RECENT DEVELOPMENT OF GEOTECHNICAL AND GEO-ENVIRONMENTAL ENGINEERING IN ASIA, PROCEEDINGS, 2006, : 579 - +
  • [32] Efficient solution of a multi objective fuzzy transportation problem
    Vidhya, V.
    Ganesan, K.
    PROCEEDINGS OF THE 10TH NATIONAL CONFERENCE ON MATHEMATICAL TECHNIQUES AND ITS APPLICATIONS (NCMTA 18), 2018, 1000
  • [33] A multi-objective dynamic vehicle routing problem with fuzzy time windows: Model, solution and application
    Ghannadpour, Syed Farid
    Noori, Simak
    Tavakkoli-Moghaddam, Reza
    Ghoseiri, Keivan
    APPLIED SOFT COMPUTING, 2014, 14 : 504 - 527
  • [34] A new interval-valued fuzzy multi-objective approach for project time-cost-quality trade-off problem with activity crashing and overlapping under uncertainty
    Mahdavi-Roshan, Pouyan
    Mousavi, Seyed Meysam
    KYBERNETES, 2023, 52 (10) : 4731 - 4759
  • [35] A Multi-Objective Dedicated Local Search for Project Scheduling Problem
    Nino, K.
    Mejia, G.
    Amodeo, L.
    IFAC PAPERSONLINE, 2016, 49 (12): : 875 - 880
  • [36] A Multi-objective Genetic Algorithm for the Software Project Scheduling Problem
    Garcia-Najera, Abel
    del Carmen Gomez-Fuentes, Maria
    NATURE-INSPIRED COMPUTATION AND MACHINE LEARNING, PT II, 2014, 8857 : 13 - 24
  • [37] A multi-objective particle swarm optimization for project selection problem
    Rabbani, M.
    Bajestani, M. Aramoon
    Khoshkhou, G. Baharian
    EXPERT SYSTEMS WITH APPLICATIONS, 2010, 37 (01) : 315 - 321
  • [38] A Novel Multi-Objective Project Portfolio Selection and Scheduling Problem
    Harrison, Kyle Robert
    Elsayed, Saber M.
    Weir, Terence
    Garanovich, Ivan L.
    Boswell, Sharon G.
    Sarker, Ruhul A.
    2022 IEEE SYMPOSIUM SERIES ON COMPUTATIONAL INTELLIGENCE (SSCI), 2022, : 480 - 487
  • [39] Project crashing using a fuzzy multi-objective model considering time, cost, quality and risk under fast tracking technique: A case study
    Feylizadeh, Mohammad Reza
    Mahmoudi, Amin
    Bagherpour, Morteza
    Li, Deng-Feng
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2018, 35 (03) : 3615 - 3633
  • [40] Multi-objective university rescheduling problem by fuzzy programming technique
    Bhoi, Sunil B.
    Dhodiya, Jayesh M.
    European Journal of Industrial Engineering, 2024, 18 (06) : 885 - 909