Start up optimization of Combined Cycle Power Plants: Controller development and real plant test results

被引:0
|
作者
Dietl, Karin [1 ]
Link, Kilian [1 ]
机构
[1] Siemens AG, D-91058 Erlangen, Germany
关键词
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The flexible operation of combined cycle power plants (CCPPs) has recently become more and more important. Therefore an efficient, fast and highly predictable power plant start up is necessary. Model predictive control for power plant start up can be used to determine optimized setpoints for all relevant control variables (e.g. gas turbine load and steam turbine control valves) resulting in a fast plant startup while keeping all constraints. This paper presents the set up of a model predictive controller, its modeling particularities and solutions to the real time capability problem. The developed controller prototype was successfully tested online on a real plant. The measurement results, which are also presented in the paper, prove the large benefit of this technology within the scope of power plant start up. Modeling details are not within the scope of this paper, which rather focuses on the overall controller setup and the online applicability.
引用
收藏
页码:599 / 604
页数:6
相关论文
共 50 条
  • [1] Start-Up Optimization of Combined Cycle Power Plants: A Field Test in a Commercial Power Plant
    Yoshida, Yasuhiro
    Yoshida, Takuya
    Enomoto, Yuki
    Osaki, Nobuhiro
    Nagahama, Yoshito
    Tsuge, Yoshifumi
    [J]. JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 2019, 141 (03):
  • [2] Optimization of the start-up procedure of a combined cycle power plant
    Albanesi, C.
    Bossi, M.
    Magni, L.
    Paderno, J.
    Pretolani, R.
    Kuehl, P.
    Diehl, M.
    [J]. PROCEEDINGS OF THE 45TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-14, 2006, : 1841 - +
  • [3] Fuzzy Optimization of Start-Up Operations for Combined Cycle Power Plants
    Bertini, Ilaria
    Pannicelli, Alessandro
    Pizzuti, Stefano
    [J]. SOFT COMPUTING MODELS IN INDUSTRIAL AND ENVIRONMENTAL APPLICATIONS, 2010, 73 : 153 - 160
  • [4] Dynamic simulation and optimization of start-up processes in combined cycle power plants
    Shirakawa, M
    Nakamoto, M
    Hosaka, S
    [J]. JSME INTERNATIONAL JOURNAL SERIES B-FLUIDS AND THERMAL ENGINEERING, 2005, 48 (01) : 122 - 128
  • [5] Optimization of start-up process in combined cycle steam turbine of a power plant
    [J]. Ding, Y. (dyj1987214@126.com), 1600, Chinese Society for Electrical Engineering (33):
  • [6] Dynamic optimization method for start-up scheduling of a combined cycle power plant
    Shirakawa, Masakazu
    Nakamoto, Masashi
    [J]. Nippon Kikai Gakkai Ronbunshu, B Hen/Transactions of the Japan Society of Mechanical Engineers, Part B, 2002, 68 (672): : 2377 - 2384
  • [7] Optimising the start up schemes of combined cycle power plant
    Smith, CA
    Burnham, KJ
    Ham, PAL
    James, DJG
    [J]. CONTROL OF POWER PLANTS AND POWER SYSTEMS (SIPOWER'95), 1996, : 479 - 484
  • [8] Modeling and investigation start-up procedures of a combined cycle power plant
    Alobaid, Falah
    Postler, Ralf
    Stroehle, Jochen
    Epple, Bernd
    Kim Hyun-Gee
    [J]. APPLIED ENERGY, 2008, 85 (12) : 1173 - 1189
  • [9] Optimization of start-up process for unit plant in electrical power plants
    Han Pu
    Wang Fuqiang
    Dai Yijiang
    [J]. SYSTEMS, ORGANIZATIONS AND MANAGEMENT: PROCEEDINGS OF THE 3RD WORKSHOP OF INTERNATIONAL SOCIETY IN SCIENTIFIC INVENTIONS, 2009, : 113 - 121
  • [10] Modeless Start-Up Control for Operational Flexibility of Combined Cycle Power Plants
    Yoshida, Yasuhiro
    Tokuda, Yuya
    Yoshida, Takuya
    Enomoto, Yuki
    Osaki, Nobuhiro
    Nagahama, Yoshito
    Tsuge, Yoshifumi
    [J]. JOURNAL OF CHEMICAL ENGINEERING OF JAPAN, 2020, 53 (10) : 636 - 645