共 50 条
- [21] Cable painting robot for cable-stayed bridges [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON MECHANICAL ENGINEERING AND MECHANICS 2007, VOLS 1 AND 2, 2007, : 611 - 616
- [24] CONSTRUCTIBILITY OF CABLE-STAYED BRIDGES [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1991, 117 (02): : 259 - 278
- [27] Aesthetics of cable-stayed bridges [J]. FIFTH INTERNATIONAL BRIDGE ENGINEERING CONFERENCE, VOLS 1 AND 2: BRIDGES, OTHER STRUCTURES, AND HYDRAULICS AND HYDROLOGY, 2000, 1696 : A34 - A43
- [28] EFFECT OF CABLE STIFFNESS ON CABLE-STAYED BRIDGES - DISCUSSION [J]. JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1987, 113 (11): : 2309 - 2309
- [29] The impact of cable spacing on the behavior of cable-stayed bridges [J]. MAGAZINE OF CIVIL ENGINEERING, 2019, 91 (07): : 49 - 59
- [30] Measuring Methods of Cable Tension in Cable-Stayed Bridges [J]. MANUFACTURING SCIENCE AND TECHNOLOGY, PTS 1-3, 2011, 295-297 : 1230 - +