Hydraulic Transients in Hydropower Plant. Impact on Power System Dynamic Stability

被引:0
|
作者
Aguro, J. L. [1 ]
Arnera, P. L. [1 ]
Barbieri, M. B. [1 ]
Beroqui, M. C. [1 ]
Lastra, R. E. Bianchi [1 ]
Mastronardi, J. [2 ]
Molina, R. [3 ]
机构
[1] Nacl Univ La Plata, Fac Ingn, IITREE LAT, La Plata, Argentina
[2] Hidroelect Futaleufu SA, Caba, Argentina
[3] CAMMESA, Caba, Argentina
关键词
Control systems; Governors; Hydraulic turbines; Modeling; Power system dynamic stability; Power system stabilizer; Simulation; Testing;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Futaleufu hydropower plant has 4 Francis turbines rated 118 MW and it is connected to the power system by 2030 kV lines. Studies carried out in the past did not predict the instable operation of Futaleufu after a 330 kV line fault, when some Futaleufu turbines are automatically disconnected as a consequence of the faulted line tripping. Load rejection caused by disconnected turbines generate large transients in the remaining turbines due to hydraulic coupling through the common conduits. Then, to improve related models and, therefore, to improve studies results of such a line fault it was necessary to make several tests in Futaleufu power plant. Finally, these models were used to conduct studies to design a new automatism, like the gate partial closing of the remaining turbines, to obtain a dynamically stable operation of Futaleufu after the disconnection by fault of a line of 330 kilovolts.
引用
收藏
页码:3998 / +
页数:2
相关论文
共 50 条
  • [21] AUTOMATIC HYDRAULIC CONTROL SYSTEM FOR PINCH ROLLER DRIVE IN CONTINUOUS CASTING PLANT.
    TSUJI, HARUO
    ISHIKAWA, SUMIO
    NAKAO, AKIRA
    ISHIHARA, KANEMICHI
    [J]. 1981, V 42 (N 4): : 32 - 38
  • [22] USE OF PROCESS WATER IN HYDRAULIC TESTING OF NUCLEAR POWER STATION (NPS) CIRCUIT PLANT.
    Vakulenko, B.F.
    Vologdina, G.P.
    Veselov, S.N.
    Konstantinov, E.A.
    [J]. Soviet energy technology, 1986, (04): : 59 - 65
  • [23] Specific Features of Design, Manufacture and Assembly of Hydraulic Turbines for Sigalda Hydroelectric Power Plant.
    Vinokurov, G.A.
    Ugolnikov, V.V.
    Mironenko, E.Ya.
    [J]. Energomashinostroenie, 1981, (10): : 42 - 45
  • [24] COMPUTER PROGRAM SYSTEM FOR STRUCTURAL DESIGN OF NUCLEAR POWER PLANT.
    Aihara, S.
    Atsumi, K.
    Sasagawa, K.
    Satoh, S.
    [J]. Transactions of the International Conference on Structural Mechanics in Reactor Technology, 1979, M.
  • [25] UTILIZATION OF CLARIFIED WATER FROM THE HYDRAULIC ASH DISPOSAL SYSTEMS AT A THERMAL POWER PLANT.
    Gubitskii, E.I.
    Khimko, Ya.V.
    [J]. Soviet power engineering, 1983, 12 (03): : 218 - 221
  • [26] Impact of dynamic system modelling on the power stability of HVDC systems
    Aik, DLH
    Andersson, G
    [J]. IEEE TRANSACTIONS ON POWER DELIVERY, 1999, 14 (04) : 1427 - 1437
  • [27] POWER SUPPLY SYSTEM FOR A CATHODIC ELECTRO-COATING PLANT.
    Matheis, Kurt
    [J]. Siemens power engineering, 1983, 5 (02): : 68 - 73
  • [28] Impact of climate change on kaunas hydropower plant power production
    Punys, Petras
    Tirunas, Dainius
    Bagdziunaite-Litvinaitiene, Lina
    Pelikan, Bernhard
    [J]. 7TH INTERNATIONAL CONFERENCE ENVIRONMENTAL ENGINEERING, VOLS 1-3, 2008, : 674 - 679
  • [29] Dynamic modelling of a combined cycle plant for power system stability studies
    Zhang, Q
    So, PL
    [J]. 2000 IEEE POWER ENGINEERING SOCIETY WINTER MEETING - VOLS 1-4, CONFERENCE PROCEEDINGS, 2000, : 1538 - 1543
  • [30] STATOR AND NETWORK TRANSIENTS IN MULTIMACHINE POWER SYSTEM STABILITY
    JALEELI, N
    MACDONALD, DC
    [J]. PROCEEDINGS OF THE INSTITUTION OF ELECTRICAL ENGINEERS-LONDON, 1977, 124 (01): : 59 - 60