Research on Factors Affecting Mine Wall Stability in Isolated Pillar Mining in Deep Mines

被引:2
|
作者
Guo, Jiang [1 ]
Cheng, Xin [1 ]
Lu, Junji [2 ]
Zhao, Yan [1 ]
Xie, Xuebin [1 ]
机构
[1] Cent South Univ, Sch Resources & Safety Engn, Changsha 410083, Peoples R China
[2] Hunan Lianshao Construct Engn Grp Co Ltd, Changsha 410001, Peoples R China
基金
中国国家自然科学基金;
关键词
mine wall stability; Platts arch; safety factor; orthogonal experiment; regression analysis; COAL PILLAR; MODEL; SEAM;
D O I
10.3390/min12050623
中图分类号
P3 [地球物理学]; P59 [地球化学];
学科分类号
0708 ; 070902 ;
摘要
This study takes the Dongguashan Copper Mine as its engineering background. Based on the mechanical model of the mine wall under the trapezoidal load of the backfill, a comprehensive evaluation index is proposed, and its calculation equation is derived. On this basis, an orthogonal test is designed to explore the influence of mining design parameters on mine wall stability. The results show that the width of the mine wall is the main factor affecting its stability, and increasing the width of the mine wall can significantly improve its stability. When the width of the mine wall is kept above 4 m, its stability is better. When the mechanical parameters of the backfill are poor, the mine wall is prone to overturning failure. The width of the mine room has an influence on the multi-directional loading of the mine wall, but the influence on the stability of the mine wall is low. According to the regression equation calculation, the mine wall safety factor is about 1.46 under the design of G5 mining of Dongguashan Line 52, the stability of the mine wall is good after actual mining and the engineering application effect is ideal, which can provide a theoretical basis for the design of isolation pillar mining in deep mines.
引用
收藏
页数:15
相关论文
共 50 条
  • [11] Research on mine pressure behave law in mining of face under the coal pillar
    Shi Wei
    Liu Hongtao
    Cui Liang
    Jia Housheng
    HIGH PERFORMANCE STRUCTURES AND MATERIALS ENGINEERING, PTS 1 AND 2, 2011, 217-218 : 1721 - 1724
  • [12] Factors and challenges affecting coal recovery by opencast pillar mining in the Witbank coalfield
    Ngwenyama, P. L.
    de Graaf, W. W.
    Preis, E. P.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2017, 117 (03) : 215 - 222
  • [13] Characterization of chain pillar stability in a deep western coal mine - a case study
    DeMarco, M.J.
    Koehler, J.R.
    Lu, P.H.
    Mining Engineering, 1988, 40 (12) : 1115 - 1119
  • [14] Investigation into Coal Pillar Stability Affected by Mining Induced Stress Development within Different Coal Pillar Widths in Deep Mining
    Yang Ke
    Xie Guangxiang
    Chang Jucai
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL. VIII, PTS A AND B, 2010, 8 : 1368 - 1373
  • [15] Research of synergetic mining for mining, dressing and backfilling integrated deep mines with complicated systems
    Tu, Shihao
    Hao, Dingyi
    Miao, Kaijun
    Liu, Xun
    Li, Wenlong
    Zhongguo Kuangye Daxue Xuebao/Journal of China University of Mining and Technology, 2021, 50 (03): : 431 - 441
  • [16] TERMINATION OF MINING OPERATIONS AND OTHER FACTORS AFFECTING MINE GAS LEAKAGE
    Zubicek, Vaclav
    Mokrosova, Andrea
    Matova, Radka
    Kratochvil, Michal
    16TH INTERNATIONAL MULTIDISCIPLINARY SCIENTIFIC GEOCONFERENCE, SGEM 2016: SCIENCE AND TECHNOLOGIES IN GEOLOGY, EXPLORATION AND MINING, VOL II, 2016, : 847 - 854
  • [17] Rock engineering aspects of a modified mining sequence in a dip pillar layout at a deep gold mine
    Jooste, Y.
    Malan, D. F.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2015, 115 (11) : 1097 - 1112
  • [18] Research and Application of Green Filling Mining Technology for Short Wall Mining in Aging Mine
    Sang Pengde
    2020 4TH INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2020), 2020, 510
  • [19] Determination of pillar width to improve mining safety in a deep burst-prone coal mine
    Li, Xuwei
    Chai, Yanjiang
    SAFETY SCIENCE, 2019, 113 : 244 - 256
  • [20] IMMEDIATE ROOF STABILITY ANALYSIS FOR NEW ROOM-AND-PILLAR MINING TECHNOLOGY IN "ESTONIA" MINE
    Nikitin, Oleg
    Sabanov, Sergei
    ENVIRONMENT, TECHNOLOGY, RESOURCES, PROCEEDINGS, 2005, : 262 - 269