Productivity Evaluation for Long Horizontal Well Test in Deep-Water Faulted Sandstone Reservoir

被引:1
|
作者
Yuan, Zhiwang [1 ,2 ]
Yang, Li [2 ]
Zhang, Yingchun [2 ]
Duan, Rui [2 ]
Zhang, Xu [2 ]
Gao, Yihua [2 ]
Yang, Baoquan [2 ]
机构
[1] China Univ Geosci Beijing, Sch Energy Resources, Beijing 100083, Peoples R China
[2] CNOOC Res Inst Co Ltd, Beijing 100028, Peoples R China
关键词
D O I
10.1155/2020/8845270
中图分类号
P3 [地球物理学]; P59 [地球化学];
学科分类号
0708 ; 070902 ;
摘要
For deep-water faulted sandstone reservoirs, the general practice is to design long horizontal wells improving well productivity. During the project implementation stage, well tests are performed on all drilled wells to evaluate well productivity accurately. Furthermore, multisize chokes are often utilized in a shorten test time for loosen formation, high test cost, and high well productivity. Nevertheless, the conventional productivity evaluation approach cannot accurately evaluate the well test productivity and has difficulty in determining the underneath pattern. As a result, the objective of this paper is to determine a productivity evaluation method for multisize chokes long horizontal well test in deep-water faulted sandstone reservoir. This approach introduces a productivity model for long horizontal wells in faulted sandstone reservoir. It also includes the determination of steady-state test time and the productivity evaluation method for multisize chokes. In this paper, the EGINA Oilfield, a deep-water faulted sandstone reservoir, located in West Africa was chosen as the research target. Based on Renard and Dupuy's steady-state equation, the relationship between the productivity index per meter and the length of horizontal section was derived. Consequently, this relationship is used to determine the productivity pattern for long horizontal wells with the same geological features, which can provide more accurate productivity evaluations for tested wells and forecast the well productivity for untested wells. After implementing this approach on the EGINA Oilfield, the determined relationship is capable to accurately evaluate the test productivity for long horizontal wells in reservoirs with similar characteristics and assist in examination and treatment for horizontal wells with abnormal productivity.
引用
收藏
页数:10
相关论文
共 50 条
  • [41] SHELL DRILLS DEEP-WATER WELL IN ATLANTIC OCS
    WILSON, J
    PETROLEUM ENGINEER INTERNATIONAL, 1983, 55 (11): : 28 - &
  • [42] Lower Cretaceous deep-water sandstone plays in the UK Central Graben
    Mllton-Worssell, R. J.
    Stoker, S. J.
    Cavill, J. E.
    DELIBERATE SEARCH FOR THE STRATIGRAPHIC TRAP, 2006, 254 : 169 - +
  • [43] SIMPLE METHOD CONTROLS WELL KICKS IN DEEP-WATER
    ANGEL, RR
    WORLD OIL, 1978, 186 (05) : 113 - &
  • [45] DEEP-WATER WELL CONTROL OFFERS COMPLEX OPTIONS
    BRUCE, GH
    WARRINER, RA
    OIL & GAS JOURNAL, 1984, 82 (26) : 92 - &
  • [46] DEEP-WATER RESERVOIR SANDSTONES OF TEXAS GULF-COAST
    BERG, RR
    AAPG BULLETIN-AMERICAN ASSOCIATION OF PETROLEUM GEOLOGISTS, 1981, 65 (09): : 1675 - 1675
  • [47] Research on reservoir architecture models of deep-water turbidite lobes
    College of Geosciences, China University of Petroleum, Beijing , China
    不详
    不详
    不详
    Nat. Gas Geosci., 8 (1197-1204):
  • [48] HORIZONTAL SUBSEA TREES ALLOW FREQUENT DEEP-WATER WORKOVERS
    KRENEK, M
    HALL, G
    SHENG, WZ
    OIL & GAS JOURNAL, 1995, 93 (18) : 68 - +
  • [49] The productivity study of gas-water two phase horizontal well in low-permeability gas reservoir
    Yuan, Lin
    Li, Xiao-Ping
    Natural Gas Geoscience, 2014, 25 (09) : 1455 - 1461
  • [50] Calculation Method of Three-Phase Productivity of Horizontal Well in Water-Bearing Condensate Gas Reservoir
    Zhang, Yufeng
    Chen, Yefei
    Xu, Anzhu
    He, Jun
    Luo, Erhui
    Liu, Yunyang
    Zeng, Xing
    Jiang, Luyang
    ENERGIES, 2024, 17 (12)