Multi-Skilled Engineering Solutions for the Production of Heavy Clay Ceramics

被引:0
|
作者
不详
机构
来源
CFI-CERAMIC FORUM INTERNATIONAL | 2014年 / 91卷 / 09期
关键词
D O I
暂无
中图分类号
TQ174 [陶瓷工业]; TB3 [工程材料学];
学科分类号
0805 ; 080502 ;
摘要
The origin of the No lay industrial site located in the Burgundy region goes back to the company CMH - Constructions Mecaniques et Hydrauliques, which was founded in 1961 to supply companies in the region with mechanical and hydraulic machinery and equipment. In May 2010 the company CLEIA established itself at the Nolay site with industrial buildings and offices covering 7300 m(2). CLEIA offers turnkey industrial units and associated services for the manufacture of heavy clay ceramics, focussing on raw materials preparation, cutting and chamfering, drying and firing as well as handling, including PLC supervision and process control for each production step. CLEIA also audits existing facilities and offers new solutions to adapt these units to manufacture new products, implement new standards, increase productivity and reduce energy consumption. The turnover in the period 2011-2013 reached over EUR 60 million, the forecast for 2014 is EUR 40 million. Eric Girardot (EG), Senior Technical Advisor, Frank Bigeard(FB), Sales Director, and ThienyAllanic(TA), Marketing Manager, gave ceramic forum international (cfi) some insights into the company and the targets it has set itself for technical and geographical market development.
引用
收藏
页码:E10 / +
页数:4
相关论文
共 50 条
  • [41] Load-balancing for multi-skilled servers with Bernoulli routing
    Fernando Miguelez
    Josu Doncel
    Balakrishna J. Prabhu
    Annals of Operations Research, 2022, 312 : 949 - 971
  • [42] Competence-based performance model of multi-skilled workers
    Malachowski, Bartlomiej
    Korytkowski, Przemyslaw
    COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 91 : 165 - 177
  • [43] Optimization of Multi-Skilled Labor with the Application of Partial Allocation of Resources
    Saleh, Amira A.
    Abotaleb, Ibrahim S.
    Hosny, Ossama A.
    CONSTRUCTION RESEARCH CONGRESS 2022: PROJECT MANAGEMENT AND DELIVERY, CONTRACTS, AND DESIGN AND MATERIALS, 2022, : 451 - 460
  • [44] A SIMULATION TOOL FOR COMPLEX ASSEMBLY LINES WITH MULTI-SKILLED RESOURCES
    Angelidis, Evangelos
    Bohn, Daniel
    Rose, Oliver
    2013 WINTER SIMULATION CONFERENCE (WSC), 2013, : 2577 - 2586
  • [45] Management of out of hours vascular emergencies - multi-disciplinary or multi-skilled?
    Donnelly, MP
    McCormick, P
    Tierney, S
    Feeley, TM
    BRITISH JOURNAL OF SURGERY, 2003, 90 : 38 - 38
  • [46] SOLVING A NOVEL MULTI-SKILLED PROJECT SCHEDULING MODEL BY SCATTER SEARCH
    Kazemipoor, H.
    Tavakkoli-Moghaddam, R.
    Shahnazari-Shahrezaei, P.
    SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2013, 24 (01) : 121 - 135
  • [47] SPECIALIZATION OF SOUTH AFRICAN JUDGES AND COURTS: MULTI-SKILLED, MULTITASKED, MULTIACCESS?
    Van Logerenberg, Danie
    RUSSIAN LAW JOURNAL, 2014, 2 (04) : 187 - 203
  • [48] Thermal behaviour of clay mixtures with bauxite residue for the production of heavy-clay ceramics
    Pontikes, Y.
    Nikolopoulos, P.
    Angelopoulos, G. N.
    JOURNAL OF THE EUROPEAN CERAMIC SOCIETY, 2007, 27 (2-3) : 1645 - 1649
  • [49] Stochastic project management: multiple projects with multi-skilled human resources
    Felberbauer, Thomas
    Gutjahr, Walter J.
    Doerner, Karl F.
    JOURNAL OF SCHEDULING, 2019, 22 (03) : 271 - 288
  • [50] Stochastic project management: multiple projects with multi-skilled human resources
    Thomas Felberbauer
    Walter J. Gutjahr
    Karl F. Doerner
    Journal of Scheduling, 2019, 22 : 271 - 288