共 50 条
- [33] Economic analysis for district heating system with gas-fired peak load boiler in secondary network PROCEEDINGS OF THE 5TH INTERNATIONAL SYMPOSIUM ON HEATING, VENTILATING AND AIR CONDITIONING, VOLS I AND II, 2007, : 161 - 164
- [35] Value analysis of district heating system with gas-fired peak load boiler in secondary network JOURNAL OF CENTRAL SOUTH UNIVERSITY OF TECHNOLOGY, 2009, 16 : 178 - 182
- [36] Low-emission district heating: Peak-load power plant in Vienna is fit for the future Euroheat and Power/Fernwarme International, 2021, 20 (11-12): : 12 - 15
- [38] Study of peak load condition during indoor climate control for Roorkee weather conditions PROCEEDINGS OF THE 25TH NATIONAL AND 3RD INTERNATIONAL ISHMT-ASTFE HEAT AND MASS TRANSFER CONFERENCE, IHMTC 2019, 2019,
- [39] Design and development of a public leisure center made up of tropical garden and an indoor swimming pool in the City of Valencia [Spain] TUBULAR STRUCTURES XII, 2009, : 491 - +
- [40] OPERATION AND LOAD OF A SEA-WATER SWIMMING POOL WITH CONTINUOUS WATER CIRCULATION FROM A PUBLIC HEALTH STANDPOINT ARCHIV FUR HYGIENE UND BAKTERIOLOGIE, 1969, 153 (04): : 298 - +