Frequency approach for treating capacity-constrained multilevel production

被引:8
|
作者
Segerstedt, A [1 ]
机构
[1] Lulea Univ Technol, SE-97187 Lulea, Sweden
关键词
D O I
10.1080/00207540410001691901
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
An idea about how to tackle and solve the difficult problem of determining economic order quantities in capacity-constrained multilevel production is presented. The idea is based on frequencies during a variable time interval as variables instead of explicit order quantities. The presented heuristic model handles assumed constant demand for several items and calculates fixed-order quantities assumed to be possible to repeat in a cyclic pattern. In the model, every item is supposed to be manufactured at least once per year, or during another maximum period, to stop order quantities that are too large and therefore hinder inventories that are exceedingly large and/or obsolete. During a time interval, it was decided how many times each item should be produced. The paper starts with a common frequency for all items, i.e. the highest frequency possible for all items during this maximum time interval considering the capacity restrictions of the different machines. Thereafter, the frequency for items with high set-up costs compared with the inventory holding costs is reduced if it decreases the total cost of set-ups and inventory holding. Only frequencies in multiples of two are used to make a cycle policy easier to establish, to prevent remnant stocks and to make the used cost approximation fit more accurately.
引用
收藏
页码:3119 / 3137
页数:19
相关论文
共 50 条
  • [31] Capacity-constrained multiple-market price discrimination
    Zhang, Bin
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (01) : 105 - 111
  • [32] Upward pricing pressure in mergers of capacity-constrained firms
    Greenfield, Daniel
    Sandford, Jeremy A.
    ECONOMIC INQUIRY, 2021, 59 (04) : 1723 - 1747
  • [33] Minimum power loading strategy for multicarrier system in capacity-constrained frequency-selective channel
    Goldfeld, L
    Lyandres, V
    ELECTRONICS LETTERS, 2005, 41 (25) : 1386 - 1388
  • [34] Sourcing under supply disruption with capacity-constrained suppliers
    Ray, Pritee
    Jenamani, Mamata
    JOURNAL OF ADVANCES IN MANAGEMENT RESEARCH, 2013, 10 (02) : 192 - 205
  • [35] Minimization of Testing Costs in Capacity-Constrained Database Migration
    Subramani, K.
    Caskurlu, Bugra
    Velasquez, Alvaro
    ALGORITHMIC ASPECTS OF CLOUD COMPUTING (ALGOCLOUD 2018), 2019, 11409 : 1 - 12
  • [36] A greedy algorithm for capacity-constrained surrogate placement in CDNs
    Chen, YF
    He, YX
    Cao, JN
    Wu, J
    NETWORK AND PARALLEL COMPUTING, PROCEEDINGS, 2005, 3779 : 180 - 188
  • [37] Simultaneous determination of lot size and production rate at capacity-constrained multiple-product systems
    Koo, Pyung-Hoi
    Koh, Shie-Gheun
    Lee, Woon-Seek
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2011, 23 (03) : 346 - 359
  • [38] Capacity-constrained scheduling for a logic IC final test facility
    Lin, JT
    Wang, FK
    Lee, WT
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2004, 42 (01) : 79 - 99
  • [39] CCR: Capacity-Constrained Replication for Data Delivery in Vehicular Networks
    Wu, Yuchen
    Zhu, Yanmin
    Zhu, Hongzi
    Li, Bo
    2013 PROCEEDINGS IEEE INFOCOM, 2013, : 2580 - 2588
  • [40] Simultaneous determination of lot size and production rate at capacity-constrained multiple-product systems
    Pyung-Hoi Koo
    Shie-Gheun Koh
    Woon-Seek Lee
    Flexible Services and Manufacturing Journal, 2011, 23