Model development for coffee processing plant location selection by using AHP method: Case of Guji Zone, Ethiopia

被引:0
|
作者
Georgise, Fasika Bete [1 ]
Jarso, Boru Bedeya [2 ]
Mindaye, Alemayehu Tesfaye [1 ]
机构
[1] Hawassa Univ Inst Technol IoT, Fac Mfg, Dept Ind Engn, Awasa, Ethiopia
[2] Bule Hora Univ, Dept Ind Engn & Logist Management, Coll Engn & Technol, Hagere Mariam, Ethiopia
来源
COGENT BUSINESS & MANAGEMENT | 2020年 / 7卷 / 01期
关键词
coffee; coffee processing plant; location; location factors; AHP method; model;
D O I
10.1080/23311975.2020.1848110
中图分类号
F [经济];
学科分类号
02 ;
摘要
It is very difficult to find a suitable location for a coffee processing plant from many alternatives. This research-developed a model by Analytic hierarchy pair wise that gives full information for a coffee processing plant to select a suitable location from alternatives as its objective. The main location factors were analyzed by the Analytic Hierarchy Process (AHP) wise method to rank candidate alternative locations.The questionnaire analysis mainly used Statistical Packaging Social Software (SPSS) and AHP method for weighting and ranking alternative locations according to the evaluation of location criteria priority values. The discussion addressed as the misallocation has an impact on selecting a suitable location before, and it is good to follow this developed model. It is inevitable for the society to update with the growth model and generally pre-coffee processing plant owners are facing problems in selecting a suitable location from alternatives in a Guji Zone. The proposed model has three main sequential stages that focus on reducing the time to decide on a new suitable location. Thus, it reduces the effort for searching and deciding the best location for pre-coffee processors. The result is summarized in the framework model that can lead users to understand the current status and the trend concerning the models and factors used in the primary coffee processing plant location selection decision. This research has proposed a suitable solution for the location problems. Finally, the recommendation was given to coffee processing actors and responsible government offices.
引用
收藏
页数:20
相关论文
共 50 条
  • [21] A MATHEMATICAL MODEL USING AHP PRIORITIES FOR SOCCER PLAYER SELECTION: A CASE STUDY
    Ozceylan, E.
    SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2016, 27 (02): : 190 - 205
  • [22] Constructed wetland-based wastewater treatment of a coffee-washing plant and its impacts: a case study of Kege processing plant, Ethiopia
    Danato, Mihret
    Yutura, Gonse Amalo
    Shura, Lamisso
    Narayanan, Kannan
    AQUA-WATER INFRASTRUCTURE ECOSYSTEMS AND SOCIETY, 2024, 73 (04) : 804 - 817
  • [23] Wastewater treatment plant site selection using AHP and GIS: a case study in Falavarjan, Esfahan
    Mansouri, Zeinab
    Moghaddas, Naser Hafezi
    Dahrazma, Behnaz
    GEOPERSIA, 2013, 3 (02): : 63 - 72
  • [24] AHP and Machine Learning-Based Military Strategic Site Selection: A Case Study of Adea District East Shewa Zone, Ethiopia
    Bojer, Amanuel Kumsa
    Woldesilassie, Firesew Feyisso
    Debelee, Taye Girma
    Kebede, Samuel Rahimeto
    Esubalew, Sintayehu Zekarias
    JOURNAL OF SENSORS, 2023, 2023
  • [25] Development of an application method for a zone stain selection model in bloodstain pattern analysis
    Illes, M.
    Stotesbury, T.
    CANADIAN SOCIETY OF FORENSIC SCIENCE JOURNAL, 2016, 49 (01) : 19 - 25
  • [26] Site suitability assessment for the development of wind power plant in Wolaita area, Southern Ethiopia: an AHP-GIS model
    Natei Ermias Benti
    Yewubdar Berhanu Alemu
    Mathewos Muke Balta
    Solomon Gunta
    Mesfin Diro Chaka
    Addisu Gezahegn Semie
    Yedilfana Setarge Mekonnen
    Hamere Yohannes
    Scientific Reports, 13
  • [27] Site suitability assessment for the development of wind power plant in Wolaita area, Southern Ethiopia: an AHP-GIS model
    Benti, Natei Ermias
    Alemu, Yewubdar Berhanu
    Balta, Mathewos Muke
    Gunta, Solomon
    Chaka, Mesfin Diro
    Semie, Addisu Gezahegn
    Mekonnen, Yedilfana Setarge
    Yohannes, Hamere
    SCIENTIFIC REPORTS, 2023, 13 (01)
  • [28] A Selection of the Best Location for a Small Hydro Power Project using the AHP-Weighted Sum and PROMETHEE Method
    Patel, Jayantilal N.
    Rana, Shilpesh C.
    PERTANIKA JOURNAL OF SCIENCE AND TECHNOLOGY, 2018, 26 (04): : 1591 - 1603
  • [29] USING AHP AND VIKOR METHOD TO EVALUATE THE, REGIONAL DEVELOPMENT: CASE OF VISEGRAD FOUR
    Polednikova, Eva
    HRADEC ECONOMIC DAYS 2014: ECONOMIC DEVELOPMENT AND MANAGEMENT OF REGIONS, PT V, 2014, : 176 - 184
  • [30] Selection of optimum plant layout using AHP-TOPSIS and WASPAS approaches coupled with Entropy method
    Shivade, Anand S.
    Sapkal, Sagar U.
    DECISION SCIENCE LETTERS, 2022, 11 (04) : 545 - 562