共 50 条
- [41] Determining the optimal number and location of cutoff points with application to data of cervical cancer PLOS ONE, 2017, 12 (04):
- [44] Optimal layout of hull structure monitoring points based on risk assessment Harbin Gongcheng Daxue Xuebao/Journal of Harbin Engineering University, 2017, 38 (01): : 1 - 7
- [46] PROSPECTS OF USE PROTECTED HYDROGEOLOGICAL AND HYDROLOGICAL OBJECTS AS REFERENCE POINTS OF BACKGROUND MONITORING SGEM 2008: 8TH INTERNATIONAL SCIENTIFIC CONFERENCE, VOL II, CONFERENCE PROCEEDINGS, 2008, : 327 - 330