共 49 条
- [42] Sequencing and scheduling of job and tool in a flexible manufacturing system using ant colony optimization algorithm The International Journal of Advanced Manufacturing Technology, 2010, 50 : 1075 - 1084
- [43] Sequencing and scheduling of job and tool in a flexible manufacturing system using ant colony optimization algorithm INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (9-12): : 1075 - 1084
- [45] Energy-efficient distributed heterogeneous blocking flowshop scheduling problem using a knowledge-based iterated Pareto greedy algorithm NEURAL COMPUTING & APPLICATIONS, 2023, 35 (09): : 6361 - 6381
- [46] Energy-efficient distributed heterogeneous blocking flowshop scheduling problem using a knowledge-based iterated Pareto greedy algorithm Neural Computing and Applications, 2023, 35 : 6361 - 6381
- [47] Intelligent Optimization Under Multiple Factories: Hybrid Flow Shop Scheduling Problem with Blocking Constraints Using an Advanced Iterated Greedy Algorithm Complex System Modeling and Simulation, 2023, 3 (04): : 282 - 306
- [48] Evaluation of the performance of the multi-objective scalarization methods for the aircraft sequencing and scheduling problem using multi-criteria decision-making AIRCRAFT ENGINEERING AND AEROSPACE TECHNOLOGY, 2023, 95 (04): : 501 - 511
- [49] Pre-emptive Resource-Constrained Multimode Project Scheduling Using Genetic Algorithm: A Dynamic Forward Approach JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT-JIEM, 2016, 9 (03): : 732 - 785