Customer outage cost evaluation of an actual failure event

被引:0
|
作者
Billinton, R [1 ]
Wangdee, W [1 ]
机构
[1] Univ Saskatchewan, Power Syst Res Grp, Saskatoon, SK S7N 0W0, Canada
关键词
customer outage cost; electric supply failure;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The customer interruption cost when an electric supply failure occurs depends on many factors, such as the customer types interrupted the actual load demand at the time of the outage, the duration of the outage, the time of day and the day in which the outage occurs. This paper illustrates the development of a procedure to perform customer outage cost evaluation on a distribution feeder subjected to a specific outage event. The data required to perform a complete evaluation is illustrated and discussed This data includes the feeder customer compositions, the profiles at the feeder load points and the relevant customer damage functions. The procedure presented in the paper is illustrated by application to a specific distribution feeder in the City of Saskatoon. The customer costs associated with power supply failures are a function of the time of the day, 4, of the week and time of the year. They are also strongly influenced by the duration of the outage event. The paper illustrates the effect of outage duration and the time of outage occurrence.
引用
收藏
页码:94 / 99
页数:2
相关论文
共 50 条
  • [41] Customer Interruption Cost Based on Hidden Failure of Power System Leading to Cascading Collapse
    Salim, Nur Ashida
    Fatillah, Mohammad Arfan Firdaus Aris
    Othman, Muhammad Murtadha
    [J]. 2021 IEEE INTERNATIONAL CONFERENCE IN POWER ENGINEERING APPLICATION (ICPEA 2021), 2021, : 51 - 55
  • [42] Modeling and evaluating the customer interruption cost due to dynamic electrical power and energy failure
    Salim, N. A.
    Othman, M. M.
    Jasni, J.
    Musirin, I.
    Serwan, M. S.
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2018, 103 : 603 - 610
  • [43] Cost evaluation of acute cardiac failure treatment in a cardiac failure unit
    Montera, M.
    Bernardez, S.
    Marques, I.
    Mesquita, E.
    [J]. CIRCULATION, 2008, 118 (12) : E305 - E305
  • [44] Statistical analysis of deviation of actual cost from estimated cost using actual project data
    Mizuno, O
    Kikuno, T
    Inagaki, K
    Takagi, Y
    Sakamoto, K
    [J]. INFORMATION AND SOFTWARE TECHNOLOGY, 2000, 42 (07) : 465 - 473
  • [45] Customer Reaction to hypothetical and actual CCRs and related information
    Johnson, BB
    [J]. JOURNAL AMERICAN WATER WORKS ASSOCIATION, 2003, 95 (08): : 90 - +
  • [46] Preventing data corruption in the event of an extended power outage
    Ives, Ted
    [J]. Elektron, 2005, 22 (02): : 12 - 14
  • [47] Cost-benefit evaluation of photovoltaic system based on customer-side
    Lu, Zheng
    Sun, Wei
    Chen, Yunfei
    [J]. Taiyangneng Xuebao/Acta Energiae Solaris Sinica, 2021, 42 (04): : 209 - 214
  • [48] Evaluation of customer interruption cost for reliability planning of power systems in developing economies
    Kaur, N
    Gurdip, S
    Bedi, MS
    Bhatti, T
    [J]. 2004 INTERNATIONAL CONFERENCE ON PROBABILISTIC METHODS APPLIED TO POWER SYSTEMS, 2004, : 752 - 755
  • [49] EVALUATION OF CUSTOMER RELATIONSHIP SYSTEM EFFICIENCY: APPLYING OF TOTAL COST OF OWNERSHIP APPROACH
    Jasilioniene, Regina
    Tamosiuniene, Rima
    [J]. JOURNAL OF BUSINESS ECONOMICS AND MANAGEMENT, 2009, 10 (04) : 343 - 347
  • [50] Evaluation of the customer interruption cost taking into consideration macro economic approach in KOREA
    Choi, SB
    Kim, DK
    Jeong, SH
    Ryu, HS
    [J]. POWERCON 2002: INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY, VOLS 1-4, PROCEEDINGS, 2002, : 2358 - 2362