Effect of cadence selection on peak power and time of power production in elite BMX riders: A laboratory based study

被引:7
|
作者
Rylands, Lee P. [1 ]
Roberts, Simon J. [2 ]
Hurst, Howard T. [3 ]
Bentley, Ian [3 ]
机构
[1] Univ Derby, Coll Life & Nat Sci, Buxton, England
[2] Liverpool John Moores Univ, Fac Educ Community & Leisure, Liverpool, Merseyside, England
[3] Univ Cent Lancashire, Div Sport Exercise & Nutr Sci, Preston, Lancs, England
关键词
Time to peak power; cadence; peak power; bicycle motocross; SPRINT PERFORMANCE;
D O I
10.1080/02640414.2016.1215491
中图分类号
G8 [体育];
学科分类号
04 ; 0403 ;
摘要
The aims of this study were to analyse the optimal cadence for peak power production and time to peak power in bicycle motocross (BMX) riders. Six male elite BMX riders volunteered for the study. Each rider completed 3 maximal sprints at a cadence of 80, 100, 120 and 140revsmin(-1) on a laboratory Schoberer Rad Messtechnik (SRM) cycle ergometer in isokinetic mode. The riders' mean values for peak power and time of power production in all 3 tests were recorded. The BMX riders produced peak power (1105 +/- 139W) at 100revsmin(-1) with lower peak power produced at 80revsmin(-1) (1060 +/- 69W, (F(2,15)=3.162; P=.266; (2)=0.960), 120revsmin(-1) (1077 +/- 141W, (F(2,15)=4.348; P=.203; (2)=0.970) and 140revs min(-1) (1046 +/- 175W, (F(2,15)=12.350; P=0.077; (2)=0.989). The shortest time to power production was attained at 120revsmin(-1) in 2.5 +/- 1.07s. Whilst a cadence of 80revs min(-1) (3.5 +/- 0.8s, (F(2,15)=2.667; P=.284; (2)=0.800) 100revs min(-1) (3.00 +/- 1.13s, (F(2,15)=24.832; P=.039; (2)=0.974) and 140revsmin(-1) (3.50 +/- 0.88s, (F(2,15)=44.167; P=.006; (2)=0.967)) all recorded a longer time to peak power production. The results indicate that the optimal cadence for producing peak power output and reducing the time to peak power output are attained at comparatively low cadences for sprint cycling events. These findings could potentially inform strength and conditioning training to maximise dynamic force production and enable coaches to select optimal gear ratios.
引用
收藏
页码:1372 / 1376
页数:5
相关论文
共 50 条
  • [11] Effect of Taper Duration on the Time Course for Changes in Maximal Power of Elite Female Swimmers
    Trinity, Joel D.
    Pahnke, Matthew D.
    Coyle, Edward F.
    MEDICINE AND SCIENCE IN SPORTS AND EXERCISE, 2006, 38 (05): : S246 - S246
  • [12] A Study of Time Window Selection for Electric Power Distribution System Analysis
    Coleman, Nicholas S.
    Miu, Karen N.
    2015 IEEE INTERNATIONAL SYMPOSIUM ON CIRCUITS AND SYSTEMS (ISCAS), 2015, : 1891 - 1894
  • [13] Study on wind power consumption based on system peak regulation capability constrain
    Sun Y.
    Wei M.
    Wang L.
    Guo Y.
    Luo Y.
    Wang Z.
    Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2019, 47 (19): : 107 - 112
  • [14] Selection of time window for wind power ramp prediction based on risk model
    Zha, Xiaoming
    Ouyang, Tinghui
    Qin, Liang
    Xiong, Yi
    Huang, Heming
    ENERGY CONVERSION AND MANAGEMENT, 2016, 126 : 748 - 758
  • [15] Companding system based on time clustering for reducing peak power of OFDM symbol in wireless communications
    Takyu, Osamu
    Ohtsuki, Tomoaki
    Nakagawa, Masao
    IEICE TRANSACTIONS ON FUNDAMENTALS OF ELECTRONICS COMMUNICATIONS AND COMPUTER SCIENCES, 2006, E89A (07) : 1884 - 1891
  • [16] A Real-Time Power Distribution based on Load/Generation Forecasting for Peak-Shaving
    Nishihara, Hide
    Taniguchi, Ittetsu
    Kato, Shinya
    Fukui, Masahiro
    2013 IEEE 11TH INTERNATIONAL NEW CIRCUITS AND SYSTEMS CONFERENCE (NEWCAS), 2013,
  • [17] THE WINGATE ANAEROBIC POWER TEST, PEAK BLOOD LACTATE, AND MAXIMAL OXYGEN DEBT IN ELITE VOLLEYBALL PLAYERS - A VALIDATION-STUDY
    TAMAYO, M
    SUCEC, A
    PHILLIPS, W
    BUONO, M
    LAUBACH, L
    FREY, M
    MEDICINE AND SCIENCE IN SPORTS AND EXERCISE, 1984, 16 (02): : 126 - 126
  • [18] Study on photovoltaic power forecasting model based on peak sunshine hours and sunshine duration
    Zhao, Hang
    Zhu, Delan
    Yang, Yalin
    Li, Qianlin
    Zhang, Enze
    ENERGY SCIENCE & ENGINEERING, 2023, 11 (12) : 4570 - 4580
  • [19] The effect of measurement time resolution on the peak time power demand reduction potential of domestic solar hot water systems
    Naspolini, Helena F.
    Ruether, Ricardo
    RENEWABLE ENERGY, 2016, 88 : 325 - 332
  • [20] Coupling time varying power sources to production of green-hydrogen: A superstructure based approach for technology selection and optimal design
    Corengia, Mariana
    Torres, Ana I.
    CHEMICAL ENGINEERING RESEARCH & DESIGN, 2022, 183 : 235 - 249