Using constructed wetland systems to remove solids from highly polluted river water

被引:12
|
作者
Jing, SR [1 ]
Lin, YF [1 ]
Lee, DY [1 ]
Wang, TW [1 ]
机构
[1] Chia Nan Coll Pharm & Sci, Dept Environm Engn & Hlth, Tainan, Taiwan
关键词
constructed wetlands; solids removal; river water; macrophytes; algae; water resources;
D O I
10.2166/ws.2001.0011
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The Erh-Ren River Is located in southern Taiwan and is one of the most polluted rivers in Taiwan. A pilot-scale constructed wetlands (ERRCW) system containing a free surface flow wetland (FSF) followed by a subsurface flow wetland (SSF) was set up to treat the polluted river water. The system was designed to include solids removal. A removal efficiency of suspended solids (SS) in the ERRCW system that was greater than in a control system indicates that the existence of macrophytes in wetlands could enhance solids removal. The results of this study also showed that SS were removed mainly through the SSF in the ERRCW system. The poor removal of SS, or even an increase in SS, that occurred in the FSF was found to be caused by the growth of algae. Although the macrophytes reduced the penetration of sunlight into the water in the FSF portion of the ERRCW system, the residue of nutrients in water and a low flushing rate still induced the growth of algae on some open water surfaces. From this study, it may be concluded that the roles played by macrophytes in solids removal include providing barriers for filtration, reducing sunlight penetration, supplying oxygen to enhance biodegradation of organic solids, and absorbing nutrients to limit the growth of algae.
引用
收藏
页码:89 / 96
页数:8
相关论文
共 50 条
  • [21] An Intensified Hybrid Constructed Wetland for Polluted Channel Water Treatment
    Hernandez-Rodriguez, I. A.
    Gonzalez-Blanco, G.
    Aguirre-Garrido, J. F.
    Beristain-Cardoso, R.
    WATER AIR AND SOIL POLLUTION, 2022, 233 (03):
  • [22] An Intensified Hybrid Constructed Wetland for Polluted Channel Water Treatment
    I. A. Hernández-Rodríguez
    G. González-Blanco
    J. F. Aguirre-Garrido
    R. Beristain-Cardoso
    Water, Air, & Soil Pollution, 2022, 233
  • [23] Seasonal and spatial dynamics of denitrification rate and denitrifier community in constructed wetland treating polluted river water
    Li, Bingxin
    Chen, Jianfei
    Wu, Zhen
    Wu, Sifeng
    Xie, Shuguang
    Liu, Yong
    INTERNATIONAL BIODETERIORATION & BIODEGRADATION, 2018, 126 : 143 - 151
  • [24] Characteristics of nitrogen and phosphorus removal by a surface-flow constructed wetland for polluted river water treatment
    Dzakpasu, Mawuli
    Wang, Xiaochang
    Zheng, Yucong
    Ge, Yuan
    Xiong, Jiaqing
    Zhao, Yaqian
    WATER SCIENCE AND TECHNOLOGY, 2015, 71 (06) : 904 - 912
  • [25] Purification efficiencies of a multi-stage bypass constructed wetland for treating polluted water from Nanfei River, Chaohu Catchment
    Ma S.
    Pan J.
    Wu X.
    Wang Q.
    Shang L.
    He Y.
    Li Y.
    Hupo Kexue/Journal of Lake Sciences, 2016, 28 (02): : 303 - 311
  • [26] Performance of the Constructed Wetland System for the Treatment of Water from the Corumbatai River
    Borges, Ana Kleiber Pessoa
    Tauk-Tornisielo, Samia Maria
    Domingos, Roberto Naves
    de Angelis, Dejanira de Franceschi
    BRAZILIAN ARCHIVES OF BIOLOGY AND TECHNOLOGY, 2008, 51 (06) : 1279 - 1286
  • [27] Treatment of polluted river water using pilot-scale Constructed Wetlands
    Ruan, X
    Xue, Y
    Wu, J
    Ni, L
    Sun, M
    Zhang, X
    BULLETIN OF ENVIRONMENTAL CONTAMINATION AND TOXICOLOGY, 2006, 76 (01) : 90 - 97
  • [28] Treatment of Polluted River Water Using Pilot-Scale Constructed Wetlands
    X. Ruan
    Y. Xue
    J. Wu
    L. Ni
    M. Sun
    X. Zhang
    Bulletin of Environmental Contamination and Toxicology, 2006, 76 : 90 - 97
  • [29] Treatment of Polluted River Water Using Surface Flow Constructed Wetlands in Xinyi River Floodplain
    Wu, Jianqiang
    Wang, Min
    Wu, Jian
    Tang, Hao
    ADVANCES IN CHEMICAL ENGINEERING, PTS 1-3, 2012, 396-398 : 1909 - 1913
  • [30] Efficacy of a large-scale constructed wetland to remove phosphorus and suspended solids from Lake Apopka, Florida
    Dunne, Ed J.
    Coveney, Michael F.
    Marzolf, Erich R.
    Hoge, Victoria R.
    Conrow, Roxanne
    Naleway, Robert
    Lowe, Edgar F.
    Battoe, Lawrence E.
    ECOLOGICAL ENGINEERING, 2012, 42 : 90 - 100