Simulation Model for Scheduling Bus Rapid Transit

被引:0
|
作者
Meilani, Difana [1 ]
Auliya, Azizatul [1 ]
Arief, Ikhwan [1 ]
机构
[1] Andalas Univ, Dept Ind Engn, Fac Engn, Padang, Indonesia
关键词
D O I
10.1088/1742-6596/1175/1/012189
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
Trans Padang Bus is a Bus Rapid Transit in Padang which has operated 15 buses for one corridor along 39 km. The bus is a medium type which has 20 passenger seats capacity and 20 passenger standing capacity. Nowadays, the number of passengers Trans Padang Bus exceeds the passenger capacity causing the load factor of Trans Padang Bus can reach 170%. The load factor is one of the parameters that determine the performance of Trans Padang Bus is still not good. Improving performance of public transport operations can be done by redesigning operational scheduling by using simulation modelling. Based on the results of the research, the result of Trans Padang Bus scheduling design is more optimum than the previous schedule that determined by the load factor that is 107.5%. In the scheduling design, the number of Trans Padang Buses are 18 units, the number of trips are 5 trips and the inter departure time of the bus are 5 and 10 minutes.
引用
收藏
页数:7
相关论文
共 50 条
  • [21] Optimization model for large-scale bus transit scheduling problems
    Banihashemi, M.
    Haghani, A.
    Transportation Research Record, 2000, (1733) : 23 - 30
  • [22] Optimization model for large-scale bus transit scheduling problems
    Banihashemi, M
    Haghani, A
    TRANSPORTATION NETWORK PLANNING: PLANNING AND ADMINSTRATION, 2000, (1733): : 23 - 30
  • [23] SIMULATION STUDY OF BUS TRANSIT
    VICTOR, DJ
    SANTHAKUMAR, SM
    JOURNAL OF TRANSPORTATION ENGINEERING-ASCE, 1986, 112 (02): : 199 - 211
  • [24] Integrated optimization of multi-mode scheduling and signal control for bus rapid transit
    Han, Yin
    Tang, Yu
    Zhao, Jing
    Wang, Jingwei
    Journal of Railway Science and Engineering, 2022, 19 (09) : 2574 - 2582
  • [25] Optimal design of scheduling for bus rapid transit by combining with passive signal priority control
    Ren, Yicheng
    Zhao, Jing
    Zhou, Xizhao
    INTERNATIONAL JOURNAL OF SUSTAINABLE TRANSPORTATION, 2021, 15 (05) : 407 - 418
  • [26] Bus Rapid Transit Systems: A Viable Transit Solution
    Guckert, Wes
    ITE JOURNAL-INSTITUTE OF TRANSPORTATION ENGINEERS, 2015, 85 (11): : 38 - 41
  • [27] Scheduling Optimization of Inter-city Bus Rapid Transit Based on M/M/C/N/∞ queuing model
    Tian Xiaoyong
    Jiang Huiyuan
    Zha Jin
    ADVANCES IN COMPUTING, CONTROL AND INDUSTRIAL ENGINEERING, 2012, 235 : 294 - 297
  • [28] Bus rapid transit as a neoliberal contradiction
    Paget-Seekins, Laurel
    JOURNAL OF TRANSPORT GEOGRAPHY, 2015, 48 : 115 - 120
  • [29] The Bus Rapid Transit investment problem
    Hoogervorst, Rowan
    van der Hurk, Evelien
    Schiewe, Philine
    Schoebel, Anita
    Urban, Reena
    COMPUTERS & OPERATIONS RESEARCH, 2024, 167
  • [30] Micro simulation Based Performance Evaluation of Delhi Bus Rapid Transit Corridor
    Raj, Gautam G.
    Sekhar, Ch Ravi
    Velmurugan, S.
    2ND CONFERENCE OF TRANSPORTATION RESEARCH GROUP OF INDIA (2ND CTRG), 2013, 104 : 825 - 834