The use of performance measurement systems in the public sector: Effects on performance

被引:192
|
作者
Spekle, Roland F. [1 ]
Verbeeten, Frank H. M. [2 ]
机构
[1] Nyenrode Business Univ, NL-3620 AC Breukelen, Netherlands
[2] Univ Amsterdam, NL-1012 WX Amsterdam, Netherlands
关键词
Performance measurement systems; Performance contracting; Public sector; New public management; Contractibility; MANAGEMENT CONTROL-SYSTEMS; ORGANIZATIONAL PERFORMANCE; INCENTIVES; INDICATORS; ENGLISH; ISSUES; RISK;
D O I
10.1016/j.mar.2013.07.004
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
We study the use of performance measurement systems in the public sector. We hypothesize that the way in which these systems are being used affects organizational performance, and that these performance effects depend on contractibility. Contractibility encompasses clarity of goals, the ability to select undistorted performance metrics, and the degree to which managers know and control the transformation process. We expect that public sector organizations that use their performance measurement systems in ways that match the characteristics of their activities outperform those that fail to achieve such fit. We test our hypotheses using survey data from 101 public sector organizations. Our findings indicate that contractibility moderates the relationship between the incentive-oriented use of the performance measurement system and performance. Using the performance measurement system for incentive purposes negatively influences organizational performance, but this effect is less severe when contractibility is high. We also find that an exploratory use of the performance measurement system tends to enhance performance; this positive effect is independent of the level of contractibility. The effectiveness of the introduction of performance measurement systems in public sector organizations thus depends both on contractibility and on how the system is being used by managers. These findings have important implications, both for practice and for public policy. (C) 2013 Elsevier Ltd. All rights reserved.
引用
收藏
页码:131 / 146
页数:16
相关论文
共 50 条
  • [21] Effects of Ethics and Performance Management on Organizational Performance in the Public Sector
    Khaltar, Odkhuu
    Moon, M. Jae
    PUBLIC INTEGRITY, 2020, 22 (04) : 372 - 394
  • [22] Debate: Systems thinking and public sector performance
    Seddon, John
    Brand, Carlton
    PUBLIC MONEY & MANAGEMENT, 2008, 28 (01) : 7 - 9
  • [23] Service Performance - Between Measurement and Information in the Public Sector
    Coste, Andreea-Ioana
    Tiron-Tudor, Adriana
    LOGOS UNIVERSALITY MENTALITY EDUCATION NOVELTY (LUMEN 2013), 2013, 92 : 215 - +
  • [24] Performance Measurement System Design as Link Between Strategy Formulation and Performance Information Use in Public Sector Organizations
    Johnsen, Age
    Solholm, Kerstin
    Tufte, Per Arne
    PUBLIC PERFORMANCE & MANAGEMENT REVIEW, 2024, 47 (04) : 813 - 848
  • [25] INTELLECTUAL CAPITAL AS A FINANCIAL PERFORMANCE MEASUREMENT IN PUBLIC SECTOR
    Alimuddin
    Novitasari, Eni
    Ichsan, Hisyam
    Pradipta, Andi Iqra
    PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON ACCOUNTING, MANAGEMENT, AND ECONOMICS 2017 (ICAME 2017), 2017, 40 : 109 - 122
  • [26] Public sector performance: Management motivation, and measurement.
    Ferrara, JA
    JOURNAL OF PUBLIC ADMINISTRATION RESEARCH AND THEORY, 2003, 13 (01) : 109 - 112
  • [27] The (un)intended outcome of public sector performance measurement
    Adcroft, Andy
    Willis, Robert
    INTERNATIONAL JOURNAL OF PUBLIC SECTOR MANAGEMENT, 2005, 18 (05) : 386 - +
  • [28] Conceptualizing dysfunctional consequences of performance measurement in the public sector
    Siverbo, Sven
    Caker, Mikael
    Akesson, Johan
    PUBLIC MANAGEMENT REVIEW, 2019, 21 (12) : 1801 - 1823
  • [29] PERFORMANCE-MEASUREMENT IN PUBLIC-SECTOR SERVICES
    FLYNN, N
    POLICY AND POLITICS, 1986, 14 (03): : 389 - 404
  • [30] Performance monitoring systems for public sector IT outsourcing contracts
    Perrin, B
    Pervan, G
    INNOVATIONS THROUGH INFORMATION TECHNOLOGY, VOLS 1 AND 2, 2004, : 639 - 642